Current traffic and expansion of the Orlando International Airport made improved access atthe existing SR 417 interchange a high priority. A unique aspect of the SR 417 interchange modificationswas the use of horizontally curved, precast concrete U-girders for three of the ramp bridges. This was thefirst use of these girders in Florida, and the first standard delivery project in the United States toincorporate curved precast concrete U-girders as the primary design.
展开▼
机译:奥兰多国际机场目前的交通流量和扩建使得前往奥兰多的交通更加便利
现有的SR 417互换性很高。 SR 417互换修改的独特之处
三座坡道桥梁使用水平弯曲的预制混凝土U型梁。这是
首次在佛罗里达使用这些大梁,并在美国进行了第一个标准交付项目,以
结合了弯曲的预制混凝土U型梁作为主要设计。
展开▼