首页> 外文会议>North American Society for Trenchless Technology;North American Society for Trenchless Technology no-dig show >Sometimes Big Problems Require Small Solutions – Microtunneling in New York City Reduces CSO Events
【24h】

Sometimes Big Problems Require Small Solutions – Microtunneling in New York City Reduces CSO Events

机译:有时大问题需要解决方案–纽约市的微隧道减少了CSO事件

获取原文

摘要

The Bergen Basin Sewer project consists of the construction of a new 48-inch parallel interceptor sewer beneath the busy Belt Parkway near JFK Airport in New York City. The project is intended to reduce combined sewer overflow (CSO) discharges into Bergen Basin and Jamaica Bay by relieving an existing hydraulic bottleneck in the West Interceptor to the Jamaica Wastewater Treatment Plant.To reduce construction cost, minimize traffic and environmental impacts, and expedite construction schedule, the new interceptor sewer was specified to be constructed using trenchless methods in lieu of open-cut construction. Soil, groundwater, and environmental conditions were favorable for microtunneling, which was the required method of construction.
机译:卑尔根盆地下水道项目包括在纽约市肯尼迪国际机场附近繁忙的贝尔特公园路下方建造一个新的48英寸平行拦截器下水道。该项目旨在缓解西部拦截器中牙买加污水处理厂现有的水力瓶颈,从而减少进入卑尔根盆地和牙买加湾的下水道溢流总量。 为了降低施工成本,最大程度地减少交通和环境影响以及加快施工进度,新的拦截器下水道被指定使用无沟槽方法代替明挖施工。土壤,地下水和环境条件有利于微隧道施工,这是必不可少的施工方法。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号