In 2013, the Federal Highway Administration (FHWA) doubled the VE-study, qualifying thresholds for highway and bridge projects ($25M/$20M to $50M/$40M). Since that time, the number of state DOT VE studies and their corresponding annual VE savings have fallen by about 50 percent. For some states, this change has made FHWA-mandated VE studies very rare. However, some other states have not limited their VE studies to FHWA-mandated thresholds. For example, the Missouri Department of Transportation (MoDOT) has continued to conduct VE studies on smaller projects to stretch their program dollars. One recent example is the VE study for a rural interchange project near Lake of the Ozarks, MO. Though the project's estimated cost was only $12 million, MoDOT selected it for a VE study because of its location and complexities that appeared to provide potential for VE savings. In a three-day, VE workshop, scaled to its smaller project size, the VE team developed VE proposals that resulted in $2.85 million in accepted VE savings (23% of construction cost) and a 68% increase in value. This paper summarizes the project, process, and results of the VE study that affirm the potential benefits of using VE on projects well below the FHWA thresholds. Most DOT programs contain a "gold mine" of VE savings that can "mined" through scaled VE studies conducted on smaller projects. Conducting VE studies on applicable projects below the FHWA thresholds can thereby stretch the purchasing power of DOT program dollars with "VE gold."
机译:2013年,联邦公路管理局(FHWA)将VE-STOUNT(FHWA)翻了一番,公路和桥梁项目的合格阈值(2500万美元/美元至50米/欧元)。从那时起,状态DOT研究的数量及其相应的年度储蓄已经下降了大约50%。对于一些国家而言,这种变化使得FHWA制定的VE研究非常罕见。但是,其他一些国家并不限于他们对FHWA的阈值的研究。例如,密苏里州的交通部(议案)继续对较小项目进行举措以延伸其计划美元的研究。最近的一个例子是莫西克斯湖附近的农村交流项目的VE研究。虽然该项目的估计成本仅为1200万美元,但由于其位置和复杂性似乎提供了VE储蓄的位置和复杂性,因此为VE研究选择了这一点。在一个三天的历史上,在较小的项目规模上,VE团队开发了VE提案,导致了285万美元的公认储蓄(施工成本的23%),价值增加68%。本文总结了VE研究的项目,过程和结果,确认了在FHWA阈值低于FHWA阈值的项目中使用VE的潜在好处。大多数DOT程序都包含一个节省的“金矿”,可以通过对较小项目进行的缩放VE研究“开采”。在FHWA阈值下面的适用项目进行VE研究,可以使用“VE金”来延长点计划美元的购买力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号