首页> 外文会议>SAVE value summit >THE APPLICATION OF VALUE MANAGEMENT WITH PUBLIC ENGAGEMENT TO IMPROVE THE DESIGN OF A PUBLIC AREA FOR ELDERS
【24h】

THE APPLICATION OF VALUE MANAGEMENT WITH PUBLIC ENGAGEMENT TO IMPROVE THE DESIGN OF A PUBLIC AREA FOR ELDERS

机译:价值管理与公众参与的应用改善老年人公共区域的设计

获取原文

摘要

The design and construction of public projects should take into consideration of the needs and wants of the people affected, especially those of elders who are easily affected by their environment. The concept of public engagement (PE) has been gradually applied in public projects in order to ensure the projects' success and the satisfaction of the stakeholders. However, because of differences in the various stakeholders' backgrounds, values, interests, and so on, it is not easy to implement PE successfully. For this study value management (VM) was integrated into the PE process with the aim of improving the design of a public area so as to satisfy the special needs of elders. The participants, including members of the community and outsiders who could affect the decision making, went through the entire three-stage VM-embedded PE process. A logical, systematic VM plan was integrated, and various VM techniques - including Function Analysis Systematic Diagrams (FAST) and star diagrams, brainstorming and so on - were purposively incorporated into the process. The participants identified the major function of the public area, developed a FAST diagram and, in the different PE stages, put forward numerous ideas to improve the project. All the participants were fully satisfied with the final design option, which focused on the needs of elders. The high average score (4.8/5) the client gave on the feedback form also demonstrates the success of the VM-embedded PE process. The key factors in the success of the VM-embedded PE process are pointed out in the discussion section.
机译:公共项目的设计和施工应考虑到受影响人群的需求和需要,尤其是那些容易受到环境影响的老年人的需求。公众参与(PE)的概念已逐渐应用于公共项目中,以确保项目的成功和利益相关者的满意。但是,由于各个利益相关者的背景,价值观,利益等方面的差异,成功实施PE并不容易。在本研究中,将价值​​管理(VM)集成到PE过程中,旨在改进公共区域的设计,以满足老年人的特殊需求。参与者(包括社区成员和可能影响决策的外部人员)经历了VM嵌入的整个三个阶段的PE过程。整合了一个逻辑,系统的VM计划,并且有目的地将各种VM技术(包括功能分析系统图(​​FAST)和星图,头脑风暴等)整合到了该过程中。参与者确定了公共区域的主要功能,绘制了FAST图,并在不同的PE阶段提出了许多改进项目的想法。所有参与者都对最终设计方案完全满意,该方案专注于长者的需求。客户在反馈表上给出的高平均分(4.8 / 5)也证明了VM嵌入的PE过程的成功。讨论部分指出了嵌入VM的PE过程成功的关键因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号