This study adopts and analyzed a shield tunneling case in Taiwan, with a diameter from 5.25m to 6.70m and the smallest radius of curvature 100m, which was constructed in gravel formations as well as a vibration sensitive area. In this case study, a vibration monitoring plan, comprising the sensors inside the shield machine and on the surface, was proposed and performed to provide the vibration data during the construction. In this project, the major vibration reduction considerations were increasing the open ratio of the cutter head (to reduce the cutting function) and reducing the rotational speed of the cutter head. The results of the construction suggest the appropriateness of the above considerations. The findings could provide suggestions to the other similar shield tunneling cases.
展开▼