首页> 外文会议>ITA-AITES world tunnel congress >Challenges and Solutions Related to the Interaction of Soil Conditioning and Main Drive on Large Diameter EPB TBM's: A Case History
【24h】

Challenges and Solutions Related to the Interaction of Soil Conditioning and Main Drive on Large Diameter EPB TBM's: A Case History

机译:大直径EPB TBM上土壤调节与主驱动器相互作用的挑战和解决方案:案例历史

获取原文

摘要

The Sparvo Tunnel belongs to "Variante di Valico" project, a new 65 km highway link between Bologna and Florence, designed to renew the existing Al route and to connect in a faster way Bologna and Florence. It is composed of a 2,5 km twin tunnel excavated in a complex geological context, characterized by the presence of a series of surface landslides and methane gas.
机译:Sparvo隧道属于“ Variante di Valico”项目,该项目是博洛尼亚和佛罗伦萨之间新的65公里高速公路连接线,旨在更新现有的Al路线并以更快的方式连接博洛尼亚和佛罗伦萨。它由在复杂地质环境中开挖的2.5公里双隧道组成,其特征是存在一系列地面滑坡和甲烷气。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号