首页> 外文会议>ITA-AITES world tunnel congress >Ventilation Challenges During Construction of Emergency Galleries
【24h】

Ventilation Challenges During Construction of Emergency Galleries

机译:紧急通道建设期间的通风挑战

获取原文

摘要

The 14km long, Arlbergtunnel, closed for public traffic during summer 2015, receiving a comprehensive and substantial renovation from 2015 to 2017. The main works discussed here, carried out during 2015, comprise 37 drill and blast SEM/NATM emergency escape tunnels from road level to the ventilation duct plenum have to be constructed as well as eight additional lay-by niches and three transformer tunnels. This presentation comprises the construction ventilation design, designed according to national regulations, suitable for 150 employees working 24/7 simultaneously at more than 40 single working sites lined up along the tunnel. The ventilation-system chosen was utilising two existing shafts for intake/discharge and a cross passage to surface, to handle a total fan power of 1.600kW.
机译:长达14公里的Arlbergtunnel于2015年夏季关闭,2015年至2017年进行了全面而重大的翻新。此处讨论的主要工程是2015年进行的,包括37条道路爆破式SEM / NATM紧急逃生隧道。到通风管道压力通风系统的地方必须建造,另外还需要八个额外的壁ni和三个变压器隧道。此演示文稿包括根据国家法规设计的建筑通风设计,适合150名在隧道沿线排列的40个单一工作地点同时工作的员工,他们全天候24/7。选择的通风系统是利用两个现有的竖井进行进/排气,并通过一个与地面的横向通道来处理1.600kW的总风扇功率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号