首页> 外文会议>ASME international mechanical engineering congress and exposition >TECHNICAL AND ECONOMICAL INVESTIGATION OF WIND POWER POTENTIAL IN KUWAIT
【24h】

TECHNICAL AND ECONOMICAL INVESTIGATION OF WIND POWER POTENTIAL IN KUWAIT

机译:科威特风电潜力的技术和经济研究

获取原文

摘要

The State of Kuwait is considering diversifying its energy sector and not entirely depend on oil. This desire is motivated by Kuwait commitment to reducing its share of pollution, as a result of burning fossil fuel, and to extend the life of its oil and gas reserves. The potential for solar energy in Kuwait is quite obvious; however, it is not the case when it comes to wind energy. The aim of this work was to analyze wind data from several sites in Kuwait and assess their suitability for building large-scale wind farms. The analysis of hourly averaged wind data showed that some sites can have an average wind speed as high as 5.3 m/s at 10 m height. The power density using Weibull distribution function was calculated for the most promising sites. The prevailing wind direction for these sites was also determined using wind-rose charts. The power curves of several Gamesa turbines were used in order to identify the best turbine model in terms of specific power production cost. The results showed that the area of Abraq Al-Habari has the highest potential for building a large-scale wind farm. The payback period of investments was found to be around 7 years and the cost of electricity production was around US Cent 4/kWh.
机译:科威特的状态正在考虑多样化其能源部门,而不是完全取决于石油。这种愿望是由于燃烧化石燃料的结果,科威特承诺降低其污染份额,并延长石油和天然气储量的生命。科威特的太阳能潜力相当明显;但是,在风能方面不是这种情况。这项工作的目的是分析来自科威特的几个地点的风数据,并评估其建设大型风电场的适用性。对每小时平均风数据的分析表明,一些位点可以具有高达5.3米/米的平均风速,高于10米。使用Weibull分布函数的功率密度为最有前途的网站计算。这些位点的普遍风向也使用风玫瑰图确定。使用若干Gamesa涡轮机的功率曲线,以便在特定的电力生产成本方面识别最佳涡轮机模型。结果表明,Abraq al-Habari的面积具有建设大型风电场的最高潜力。发现投资的投资回收期是7年左右,电力生产成本约为4 /千瓦时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号