首页> 外文会议>China International conference on electricity distribution >Shunt capacitor bank protection in UHV pilot project
【24h】

Shunt capacitor bank protection in UHV pilot project

机译:特高压试验项目中的并联电容器组保护

获取原文

摘要

The configuration and setting of shunt capacitor bank protection is very important to ensure the safety of power system and power equipment. This paper introduces the shunt capacitor banks connection and shunt capacitor banks protection configuration of the UHV pilot project from Southeast Shanxi via Nanyang in Henan province to Jinmen in Hubei province. The application principle on the configuration and setting of this 110 kV shunt capacitor banks protection is studied and discussed in detail. The principle to ensure the safety of power equipment is chiefly taken into account in order to achieve a reasonable configuration and setting.
机译:并联电容器组保护的配置和设置对于确保电力系统和电力设备的安全非常重要。本文介绍了山西东南部,河南省南阳市和湖北省金门市特高压试验项目的并联电容器组连接和并联电容器组保护配置。研究并讨论了该110 kV并联电容器组保护配置和设置的应用原理。为了实现合理的配置和设置,主要考虑了确保电力设备安全的原则。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号