Analysis of Overvoltages in a 110 kV/MV Substation as a Result of Lightning Discharges to the Overhead Line

机译:由于避雷排放到架空线,在110kV / MV变电站中分析过电压

获取原文

摘要

The reliability of electrical power transmission and distribution systems depends on progress in the coordination of insulation, which depends, among other things, on increasing the ability to identify risks of overvoltages in insulation systems. The purpose of the paper is to present the problems related to the overvoltages of the power system caused by lightning. The article analyses two possible scenarios of sources of these disturbance: shielding failure and backflashover phenomena. The first case concerns the situation when, despite the ground wires used, it is possible to discharge into the phase conductor. The second case concerns the situation of loss of electrical strength of the insulation system used. The aim of the paper is to analyze the possibility of damage to station equipment as a result of lightning to the elements of the overhead line supplying the 110 kV/MV station. For this purpose, overvoltages levels in 110 kV substation will be determined for characteristic peak values of lightning currents: Imax and Imin - respectively for scenario of shielding failure and backflashover phenomena. Between the Imax and Imin values, we assume lightning protection (lightning strikes to ground wire). The calculations were carried out on a selected fragment of the real 110 kV power system. The simulations were performed using The Electromagnetic Transients Program - Alternative Transients Program (EMTP-ATP) and Matlab.
机译:电力传输和分配系统的可靠性取决于绝缘的协调的进展,其中包括提高识别绝缘系统中过电压风险的能力。本文的目的是介绍与闪电引起的电力系统过电压相关的问题。本文分析了这些干扰来源的两个可能的情景:屏蔽失败和反射现象。第一种情况涉及情况,尽管所用接地线,但可以进入相导体。第二种病例涉及所用绝缘系统的电力损失的情况。本文的目的是分析由于避雷到供应110 kV / MV站的架空线的元件而导致损坏站设备的可能性。为此目的,110 kV变电站中的过电压水平将确定雷电电流的特征峰值:IMAX和IMIN - 分别用于屏蔽失败和反射现象的场景。在IMAX和IMIN值之间,我们假设防雷(雷击到地线)。在真实110 kV电力系统的选定片段上进行计算。使用电磁瞬变程序 - 替代瞬态程序(EMTP-ATP)和MATLAB进行模拟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号