首页> 外文会议>Air and Waste Management Association annual conference and exhibition >Strategies to Deal with Monitored Exceedances When AERMOD Can't be Used
【24h】

Strategies to Deal with Monitored Exceedances When AERMOD Can't be Used

机译:无法使用AERMOD时应对受监控的超出情况的策略

获取原文

摘要

1. Monitored SO_2 concentrations exceed the new 1-hour SO_2 NAAQS at nearby Water Tower Monitor. 2. AERMOD is showing compliance at the monitoring station with predicted concentrations a factor of two lower than monitored. 3. The corner vortex was found to be the problem. 4. Solution to the problem found: - Determined the actual GEP stack height using wind tunnel modeling - Determined compliance at GEP height using HYWINMOD - Determined compliance using Hybrid AERMOD approach.
机译:1.在附近的水塔监控器上,所监测的SO_2浓度超过了新的1小时SO_2 NAAQS。 2. AERMOD显示监测站的预期浓度达标,比预期浓度低两倍。 3.发现角涡是个问题。 4.解决所发现问题的方法:-使用风洞模型确定实际的GEP堆高-使用HYWINMOD确定在GEP高度的顺应性-使用混合AERMOD方法确定的顺应性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号