1. Based on actual field results in Nashville & Brentwood 2. Largest published database for measured Ⅰ/Ⅰ reduction in the US 3. Analyzed 126 miles of rehabilitation (282 miles total - ~ 11% system) 4. Ⅰ/Ⅰ cut in half 5. 123 overflows eliminated 6. EPA commends stream improvements.
展开▼