A BIM-Based System for Estimating Impacts of Contract Change in Car Depot Engineering Projects

机译:基于BIM的汽车仓库工程项目合同变更影响估算系统

获取原文

摘要

Statistics showed frequent contract changes in car depot engineering projects, which resulted in huge budget overrun and extended duration. Estimating the impact of contract changes, which usually takes a considerable amount of time, is the key step for contract change management. The adoption of building information modeling (BIM) can facilitate the estimation process. Firstly, using quantity take-off from BIM, engineers and contractors can calculate the changed parts in construction more quickly and efficiently. Secondly, BIM can help determine changes that have greatest impact on follow-up activities. This paper demonstrates the use of BIM in car depot engineering projects. An algorithm was developed to extract network diagram from BIM models. The impact of contract changes on follow-up activities was calculated using a rule-based engine. The proposed framework was tested on a case of car depot engineering project from Guangzhou Metro Group.
机译:统计数据表明,汽车仓库工程项目中的合同频繁变化,从而导致巨额预算超支和工期延长。评估合同变更的影响通常需要花费大量时间,这是合同变更管理的关键步骤。采用建筑信息模型(BIM)可以简化估算过程。首先,利用BIM的数量提取,工程师和承包商可以更快,更有效地计算出施工中的变更零件。其次,BIM可以帮助确定对后续活动影响最大的变更。本文演示了BIM在汽车维修厂工程项目中的使用。开发了一种从BIM模型中提取网络图的算法。合同变更对后续活动的影响是使用基于规则的引擎来计算的。在广州地铁集团的一个汽车仓库工程项目中,对提出的框架进行了测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号