首页> 外文会议>Canadian Society for Civil Engineering annual conference >INVESTIGATION OF GROUTED PRECAST CONCRETE WALL CONNECTIONS AT SUBFREEZING CONDITIONS
【24h】

INVESTIGATION OF GROUTED PRECAST CONCRETE WALL CONNECTIONS AT SUBFREEZING CONDITIONS

机译:冻融条件下注浆预制混凝土墙连接的研究

获取原文

摘要

The effect of exposing grouted precast wall connections to subfreezing curing temperatures at early-age was explored in this study. In cold weather construction, heating of the surrounding environment of grouted precast wall connections is usually conducted for short periods of time. Hence, subfreezing conditions can affect the strength of the grout and the bond strength of the connection, which can ultimately compromise the integrity of the structure. In this study, grout specimens typical of that used in precast wall construction were cured at ambient conditions for one day, and then placed in an environmental chamber at subfreezing temperatures (-10°C and -20°C). The compressive strength development of the grout was monitored, and the bond strength of grouted connections cured at cold temperature were quantified and compared to that of specimens cured at ambient temperature. The bond was investigated on 25M deformed steel bars, which is the typical size used in precast concrete wall grouted connections. Test results indicate a reduction in grout strength and the need for a longer embedment length when early-age curing is conducted at subfreezing conditions.
机译:在这项研究中探讨了将灌浆的预制墙连接暴露于早期的亚冰点固化温度的影响。在寒冷的天气中,通常在短时间内对注浆的预制墙连接件周围的环境进行加热。因此,次冻结条件可能会影响灌浆的强度和连接的粘结强度,从而最终损害结构的完整性。在这项研究中,将预制墙构造中典型的灌浆标本在环境条件下固化一天,然后将其放置在低于冰点温度(-10°C和-20°C)的环境室内。监测灌浆的抗压强度发展,量化在低温下固化的灌浆连接的粘结强度,并将其与在环境温度下固化的试样的粘结强度进行比较。在25M变形钢筋上研究了粘结,这是预制混凝土墙灌浆连接中使用的典型尺寸。测试结果表明,在亚冰点条件下进行早期熟化时,灌浆强度会降低,并且需要更长的包埋长度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号