首页> 外文会议>Geo-Chicago >The Design and Monitoring of Ground Improvement for the National Exhibition and Convention Center, Shanghai, in Soft Soil
【24h】

The Design and Monitoring of Ground Improvement for the National Exhibition and Convention Center, Shanghai, in Soft Soil

机译:柔软土壤中全国展览中心地面改善的设计与监测

获取原文

摘要

National exhibition and convention center (NECC) is the largest single block building and exhibition complex constructed with large span structures in the world. The NECC, which has a footprint of more than 0.86 million square meters, involves nearly 0.35 million square meters ground improvement work. Depending on the soil properties, adjacent environmental condition, types of foundations, and floor loading as well as stress histories, different ground improvement techniques were adopted. Rigid pile composite foundation with a large pile spacing was adopted on huge indoor exhibition buildings for the first time in China, while the outdoor exhibition venues were improved by preloading. Considering the overconsolidation stress history and small floor loading, only soil replacement technique was adopted for the 35 kPa working load area. The monitoring results agree well with the calculated values. The ground achieved adequate overall bearing capacities as designed and the estimated ultimate ground settlement are within accepted values.
机译:国家展览会中心(NECC)是世界上最大的单块建筑和展览综合体,拥有全球大跨度结构。 NECC拥有超过860万平方米的占地面积,涉及近0.35亿平方米的地面改进工作。根据土壤性质,邻近的环境条件,基础类型,地板负荷以及应力历史,采用不同的地面改善技术。在中国的巨大室内展览建筑中采用刚性桩复合地基,在中国首次采用巨大的室内展览建筑,而户外展览场地则通过预加载得到改善。考虑到过度源性应力历史和小地板负荷,仅采用了35克PPA工作载荷面积采用了土壤替代技术。监测结果与计算值吻合得很好。该地面实现了适当的整体承载能力,估计的终极地面沉降在接受的价值中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号