首页> 外文会议>Geo-Chicago >The Former Fort Gillem A Unique Case History in Closed Army Base Redevelopment
【24h】

The Former Fort Gillem A Unique Case History in Closed Army Base Redevelopment

机译:前吉隆隆堡封闭军队重新开发的独特案例历史

获取原文

摘要

From 1984 to 1986, Dr. Koemer was graduate advisor of my master's program, which focused on geoenvironmental and geosynthetic studies at Drexel University. This program of study was very unique and groundbreaking for its time. In honor of Dr. Koerner, the following case history addresses the topic of the Former Fort Gillem (Gillem) Base Redevelopment, which has required particular use of all the technical skills that I acquired while studying under his advisement. For the past seven years I have been involved with this project which, from a geoenvironmental perspective, has been the most technically challenging project of my 30-year career. I have served as the Technical Director for all environmental and geotechnical matters related to the Gillem base transfer from the U.S. Army (Army) to the Urban Redevelopment Authority of the City of Forest Park (URA) through the process of redevelopment. Key technical challenges have included the following: (ⅰ) geotechnical issues related to difficult soil conditions; (ⅱ) the evaluation of environmental concerns resulting from 60 years of Army use; (ⅲ) regulatory negotiations; and (ⅳ) an evaluation of two existing dams for future use or demolition. This case history presents key technical, regulatory, and business challenges faced by the major stakeholders who were critical to the success of the process: the Owner, Army, Legal Counsel, Master Developer, Environmental Consultant, and End User.
机译:1984年至1986年,Koemer博士是我硕士计划的研究生顾问,其侧重于Drexel University的地理环境和地球合成研究。这项研究计划对于其时间非常独特和突破性。为了纪念Koerner博士,以下案例历史讨论了前堡吉拉姆(Gillem)基本重建的主题,这已经需要特别使用我在他的建议下学习时获得的所有技术技能。在过去的七年里,我参与了这个项目,从地理环境的角度来看,这是我30年的职业生涯中最具技术上挑战的项目。我曾担任与美国陆军(陆军)从美国军队(陆军)的吉隆力基地转移到森林公园(URA)的城市重建权威的全环境和岩土工事问题技术总监通过重建进程。关键技术挑战包括:(Ⅰ)与困难土壤条件相关的岩土问题; (二)陆军使用60年的环境问题评估; (Ⅲ)监管谈判; (ⅳ)评估两个现有水坝以供将来使用或拆除。本案例历史呈现了主要利益攸关方面临的主要技术,监管和商业挑战,对该过程成功至关重要:业主,军队,法律顾问,硕士开发人员,环境顾问和最终用户。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号