首页> 外文会议>IEEE-IAS/PCA Cement Industry Technical Conference >Mercury reduction - the plant experience
【24h】

Mercury reduction - the plant experience

机译:减少汞-工厂经验

获取原文
获取外文期刊封面目录资料

摘要

This paper communicates the design and installation process of a mercury capture system in a cement kiln located in the state of Oregon. The paper will document the timeline and decision points between 2006 and 2012 pertinent to the reduction of mercury first to meet a state agreement and later new federal government requirements. The use of Powder Activated Carbon, PAC, as a collection medium will be discussed along with various materials tested with less positive results. The optimization of the system to increase performance will be covered along with methods of mercury measurement and tracking employed for reporting. The paper will show that the subject plant overcame a significant challenge to install a system capable of bringing emissions in compliance with the EPA PC NESHAP limit.
机译:本文介绍了俄勒冈州水泥窑中汞捕集系统的设计和安装过程。该文件将记录2006年至2012年之间的时间表和决策点,这些时间表和决策点与首先减少汞含量以满足州协议以及后来的新联邦政府要求有关。将讨论粉末活性炭PAC作为收集介质的使用,以及经过测试的各种材料(其结果不太乐观)。将介绍系统的优化以提高性能,以及用于报告的汞测量和跟踪方法。该论文将表明,该主题工厂克服了一项重大挑战,即安装一个能够使排放符合EPA PC NESHAP限制的系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号