首页> 外文会议>IEEE Power and Energy Society General Meeting >Chance-Constrained Goal-Programming based day ahead scheduling in wind power integrated system
【24h】

Chance-Constrained Goal-Programming based day ahead scheduling in wind power integrated system

机译:风能集成系统中基于机会约束目标编程的提前调度

获取原文

摘要

To mitigate the impact of wind forecasting error uncertainty, a Chance-Constrained Goal Programming (CCGP) based day-ahead scheduling model is proposed in this paper. Compared with the traditional Chance Constrained Programming (CCP) method, the CCGP based model is more flexible, which allows higher violation probability than the predefined probability in necessary situations. In this way, the day-ahead scheduling and the uncertain range covered by reserves can be both optimized. Therefore, the reliability and economy of the system with wind power uncertainty can be considered in details with more flexibilities. In addition, because slack variables in CCGP model have corresponding physical meanings, they can provide more information to system operators. Furthermore, numerical tests are performed with the IEEE 118 bus system with wind power input. Results indicate that the proposed method achieves a good balance of cost and risk. And the total operation cost, especially the unit commitment cost, is reduced by the proposed method. Comparative evaluations of the proposed CCGP method and CCP method are presented in the paper.
机译:为了减轻风预测误差不确定性的影响,本文提出了一个机会约束的目标规划(CCGP)的日期调度模型。与传统的机会约束编程(CCP)方法相比,基于CCGP的模型更加灵活,这允许比必要情况下的预定概率更高的违规概率。以这种方式,储备覆盖的日期调度和不确定范围都可以优化。因此,通过更多的灵活性,可以考虑具有风能不确定性的系统的可靠性和经济性。此外,由于CCGP模型中的松弛变量具有相应的物理意义,因此它们可以为系统运营商提供更多信息。此外,用具有风力输入的IEEE 118总线系统执行数值测试。结果表明,该方法达到了成本和风险的良好平衡。并通过所提出的方法减少了总运营成本,特别是单位承诺成本。本文提出了所提出的CCGP方法和CCP方法的对比评价。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号