首页> 外文会议>Pipelines conference >A Repair Program to Minimize Failure Risk of Highly Distressed PCCP Circulating Water Lines
【24h】

A Repair Program to Minimize Failure Risk of Highly Distressed PCCP Circulating Water Lines

机译:一项维修计划,以最大程度地降低高危PCCP循环水管线的故障风险

获取原文

摘要

Arizona Public Service Company's Cholla Power Plant has four units with circulating water lines made of 66 in. to 72 in. diameter prestressed concrete cylinder pipe (PCCP) in Units 2, 3, and 4. PCCP in these three units has been in service for thirty-four to thirty-seven years. Inspections over the years have shown a high level of distress throughout the pipelines due to widespread corrosion of prestressing wires. A condition assessment and repair program has been developed and performed over multiple outages with the goal of minimizing the risk of failure of the pipeline and avoiding unscheduled shut down. This paper presents a unique condition assessment and repair program implemented over the past six years.
机译:亚利桑那州公共服务公司的Cholla电厂在4号机组的2号,3号和4号机组中,有4个单元的循环水管线由66英寸至72英寸直径的预应力混凝土圆柱管(PCCP)组成。三十四至三十七年。多年来的检查表明,由于预应力导线的广泛腐蚀,整个管道都存在严重的故障。已经制定了状态评估和维修程序,并针对多次中断执行了该程序,目的是将管道故障的风险降到最低,并避免计划外的停机。本文介绍了在过去六年中实施的独特的状态评估和维修计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号