Robinson Creek Railroad Tunnel Fire CSX Transportation CSXT MP CMN-6.0, SVE Branch Robinson Creek, Kentucky

机译:罗宾逊溪铁路隧道火灾CSX运输CSXT MP CMN-6.0,SVE分公司肯塔基州罗宾逊溪

获取原文

摘要

In late April 2014 a timber-lined railroad tunnel in Robinson Creek, Kentucky erupted in fire due to arson. Amec Foster Wheeler Environment & Infrastructure, Inc. (AmecFW) and several other firms immediately responded when notified by CSX Transportation (CSXT), owner and operator. Ultimately, AmecFW organized and coordinated an engineering and environmental response to protect workers and the public, evaluate alternatives, and explore the possibility of restoring the tunnel. The response required a keen focus on health, safety, and environment. The undertaking included a variety of challenges including leading the firefighting effort and managing air and water quality while reducing personal risks in an extremely hazardous work environment. Urgent assessment of the damage to the tunnel and re-establishing service was necessary to avoid closure of the coal mines served by this branch line, and the resulting socio-economic impacts. The fire was initially suppressed by "plugging" the tunnel portals with earthen fill. This reduced public exposure to poor air quality and allowed CSXT to consider alternatives and formulate a tunnel exploration plan. Once appropriate measures were in place, the team essentially "mined" back through the damaged tunnel to evaluate the condition and determine if the structure could be salvaged. When the exploration determined that the tunnel opening could be restored, the team implemented plans to restore rail service then construct a final lining system. Crews worked 24/7 for 55 days to complete the job. Rail service was re-established within 45 days. The final liner system included 650 CT M22 rockbolts and 1370 cubic yards of fiber reinforced shotcrete.
机译:2014年4月下旬,肯塔基州罗宾逊溪的木材衬里的铁路隧道爆发着火。 Amec Foster Wheeler Environment&Infrastructure,Inc。(Amecfw)和其他几家公司在被CSX运输(CSXT),所有者和运营商通知时立即回复。最终,Amecfw组织并协调了工程和环境反应,以保护工人和公众,评估替代方案,并探讨恢复隧道的可能性。响应需要敏锐的关注健康,安全和环境。承诺包括各种挑战,包括领导消防努力和管理空气和水质,同时降低极其危险的工作环境中的个人风险。有必要对隧道和重建服务造成损害的紧急评估,以避免关闭该分支机线所服务的煤矿,并产生的社会经济影响。火灾最初被“堵塞”隧道门户填充。这减少了公开的空气质量曝光,并允许CSXT考虑替代方案并制定隧道勘探计划。一旦采取适当的措施,该团队基本上“开采”损坏的隧道返回,以评估条件并确定结构是否可以销售。当勘探确定隧道开放可以恢复时,该团队实施了恢复铁路服务的计划,然后构建最终的衬里系统。工作人员24/7工作了55天才能完成这项工作。铁路服务在45天内重新建立。最终衬垫系统包括650 CT M22突波和1370立方码的纤维增强射击。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号