Saving Time Money: A Case Study of a Texas Utility's Experience Utilizing a Customized Factory-Built Substation Approach for its Standard Outdoor Open-Air Distribution Substation

机译:节省时间和金钱:采用定制工厂内置变电站的标准室外露天分配变电站采用定制的工厂内置变电站的体验的案例研究

获取原文

摘要

This paper will demonstrate the process one Texas-based investor-owned utility, Texas-New Mexico Power Co. (TNMP), utilized to convert its standard outdoor, open-air distribution substation from an on-site constructed facility to a factory-built product, customized to its unique requirements. The paper will address the project objectives established by the utility at the outset in order to clearly define success. The paper will describe, in detail, the collaborative approach used by the utility and the substation manufacturer, DIS-TRAN Packaged Substations (DTPS), from concept phase through the detailed design phase of the project. This collaborative approach ensured all key stakeholders' concerns were addressed not only in the design, but also in the final on-site assembly of the substation modules. This paper will highlight and explain how the substation manufacturer's design team utilized 3D modeling tools during the interactive design process to pre-diagnose and resolve numerous "last mile" constraints, such as shipping restrictions and site rigging availability. The case study will conclude with an itemized listing detailed cost assessment, the impact this factory-built substations approach had on the substation's completion schedule, lessons learned, and overall successful project outcome.
机译:本文将展示该过程,其中德克萨斯州的投资者拥有德克萨斯州投资电力公司(TNMP),用于将其标准的户外,露天分配变电站转换为工厂构建的工厂产品,定制以其独特的要求。本文将解决本用途设立的项目目标,以便明确定义成功。本文详细描述了本实用程序和变电站制造商使用的协作方法,通过项目的详细设计阶段,从概念阶段,概念阶段使用。这种协作方法确保了所有关键利益相关者的担忧不仅在设计中解决,而且还在变电站模块的最终现场装配中解决。本文将突出显示变电站制造商的设计团队在交互式设计过程中如何利用3D建模工具,以预先诊断和解决众多“最后一英里”的约束,例如运输限制和站点索具可用性。案例研究将以逐项列表详细的成本评估结束,该工厂内置的变电站的影响对变电站的完成时间表,经验教训以及整体成功的项目结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号