首页> 外文会议>Transmission and substation design and operation symposium >Codes, Standards, Specification Promises -Why Details Matter in Steel Pole Tower Fabrication!
【24h】

Codes, Standards, Specification Promises -Why Details Matter in Steel Pole Tower Fabrication!

机译:代码,标准,规格和承诺 - 为什么钢杆和塔的细节有关!

获取原文

摘要

Very serious consequences can and do occur when attention to even the seemingly innocuous of details of Codes, Standards, Specifications & Promises (either unintentionally or intentionally) are not strictly complied with, or kept. Codes, Standards, and Specifications are written the way they are for a reason -to incorporate "consensus best practices" and/or to remedy practices that have been demonstrated to have created a structural performance problem, or worse, a structural failure. When we consider that a structural failure of a pole or tower can most often be traced back to a failure to comply with a Code, Standard, Specification or a Promises (all become human errors) we then realize how important those details can be. Whether the error was an error of knowledge/training (such as effects of a "taped edge" at the top of a below grade barrier coating); an error of performance (perhaps an incorrectly input loading condition during design, or failure to properly review a Material test report before production); or the worst of all errors, an error of intent (cutting corners - i.e. a welder's intentional failure to properly follow a developed welding procedure or the Welding Code's minimum requirements for "preheat" before welding on a heavy base plates); they are still human errors. We write Codes, Standards, Specifications, Guidelines, etc. in order to discuss these errors as an Industry or Company and to write instructions both to educate everyone on the problem, but also to eliminate them so that others can learn from prior errors. Simple broken schedule promises can be just as costly, if not costlier than a serious field problem if they become "surprises" to the purchaser. This presentation will briefly discuss a number of observed consequences (including structural failures) resulting from the most common deviations found to the Codes, Standards, Specifications, and Promises made. These are accumulated from investigations of structural failures, or while providing technical assistance in properly resolving errors occurring in the field during assembly and erection, and/or discovered during 3~(rd) party inspection services monitoring daily fabrication of a Client's order in a fabricator's shop. The goal of the presentation will be to elevate awareness of the potential seriousness and risks when adherence to seemingly minute details of design and fabrication become trivialized, or promises/commitments made are broken.
机译:可以严格遵守或保留,在即使是似乎看似无害的细节(无意地或故意)的情况下,也可以发生非常严重的后果并且确实发生。编码,标准和规范是由于它们是有原因的方式,而纳入“共识的最佳实践”和/或对已经证明的措施做法创造了结构性性能问题,或更糟糕的结构失败。当我们认为极端或塔的结构失败最常被追溯到未能遵守代码,标准,规格或承诺(全部成为人为错误),我们会意识到这些细节的重要性。误差是否是知识/培训的错误(例如低级屏障涂层顶部的“录音边缘”的效果);性能误差(可能在设计期间输入加载条件,或者在生产之前未能审查材料测试报告);或者最糟糕的所有错误,意图错误(切割角落 - 即焊工的故意遵守发达的焊接程序或焊接代码在焊接在重型板上焊接之前的“预热”的最低要求);他们仍然是人为错误。我们编写代码,标准,规格,指南等,以便将这些错误作为行业或公司讨论,并编写指示,以便教育每个人的问题,也可以消除他们,以便其他人可以从先前的错误中学习。简单的破碎时间表承诺可以像昂贵的那样昂贵,如果他们对购买者“惊喜”而不是严重的田间问题。本演示文稿将简要讨论一些观察到的后果(包括结构故障),由所做的代码,标准,规格和承诺所发现的最常见的偏差产生。这些是从结构失败的调查中累积,或者在组装和勃起期间提供技术援助,以及在3〜(rd)党检查服务期间监测客户订单的日常制造期间的3〜(rd)党检查服务期间的误差。/或发现。店铺。当遵守看似微小的设计和制造的细节变得普通化时,展示的目标是提高对潜在的严重性和风险的认识,或者所做的承诺/承诺被破坏。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号