Near Time As Built Surveys

机译:建成时的临近时间

获取原文

摘要

Near Time As Built surveys are a simple shift in the timing and approach that can reduce the risk associated with the schedule and budget, while providing an independent Quality Assurance during the construction of an electric transmission line. Rather than performing the As Built Survey at the end of the construction phase, the surveys are performed incrementally, within days of completing segments, with each construction phase confirmed and documented. The advantages of Near Time As Built surveys provide significant business and technical benefits. First, the incremental delivery shortens the overall schedule because the activity is running concurrently with construction. Secondly, the datasets can be delivered within days of finished construction on segments, which allows for corrective action to occur quickly if site conditions or construction factors impose modification to the original design. Critical clearance measurements can be delivered within minutes of clamping in a conductor. The survey serves as Quality Assurance (QA), saving time and money for the owner and construction company. Moving the activity forward in the project timeline reduces the risk of compromising the planned energize date. The As Built survey will also meet the on-going maintenance to preclude the reoccurrence of similar issues that caused the 2010 NERC Facility Rating Alert initiative. While the obligation for entities to report to NERC has concluded, many entities continue remediation, and some have put maintenance practices in place to help preclude the recurrence of similar issues and minimize the reliability risk posed to the Bulk Power System. Finally, the acquired datasets enhance construction inspection and can be repurposed for maintenance operations for asset management / GIS databases once the transmission line is placed in service.
机译:建成时近时测量是时间和方法上的简单转变,可以降低与进度表和预算相关的风险,同时在输电线路的建设过程中提供独立的质量保证。而不是在施工阶段结束时进行竣工检验,而是在完成分段后的几天内逐步进行检验,并确认并记录每个施工阶段。近期建成的勘测的优势提供了巨大的业务和技术优势。首先,增量交付缩短了总体进度,因为活动与施工同时进行。其次,数据集可以在分段施工完成后的几天内交付,如果现场条件或施工因素对原始设计进行了修改,则可以迅速采取纠正措施。关键间隙测量可以在夹入导体后的数分钟内完成。该调查可作为质量保证(QA),为业主和建筑公司节省时间和金钱。在项目时间表中将活动向前推进可降低损害计划的启动日期的风险。竣工调查还将满足正在进行的维护要求,以防止再次发生导致2010年NERC设施评级警报计划的类似问题。尽管实体向NERC汇报的义务已经结束,但许多实体仍在继续补救,并且一些实体已实施维护实践,以帮助防止类似问题的再次发生并最大程度地降低对大功率电力系统造成的可靠性风险。最后,一旦传输线投入使用,所获取的数据集可加强施工检查,并可重新用于资产管理/ GIS数据库的维护操作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号