Deformation Characteristics and Unloading Time for Passenger-Dedicated Railway Surcharge Preloaded Subgrade

机译:铁路客运专线预载路基变形特性及卸荷时间

获取原文

摘要

Analytical design of surcharge preloading schemes on soft soils were performed using the deformation characteristics corresponding to several surcharge preloading tests. To ascertain the reliability of this technique, investigative data were collected during the construction of a passenger dedicated railway line in China to deduce the design specifications and control standards. This was done by establishing an unloading time equation based on regression curve fitting method of the measured data; given that different types of settlement deformation gives corresponding unloading time calculations. Specific methods for the calculation of surcharge preloading and unloading time point for passengers dedicated line in the railway sector were also examined. Finally, measured data from the Wuhan-Guangzhou passenger line surcharge preloaded embankment were used to verify the design validity and reliability. The predicted results matched with the settlement deformation trend and the post-construction settlement strictly meet with the control standards.
机译:利用对应于几种附加预压试验的变形特性,对软土上的附加预压方案进行了分析设计。为了确定该技术的可靠性,在中国客运专线建设过程中收集了调查数据,以得出设计规范和控制标准。这是通过根据测量数据的回归曲线拟合方法建立卸载时间方程来完成的。考虑到不同类型的沉降变形会给出相应的卸荷时间计算。还研究了计算铁路专用客运专线附加费预装和卸货时间点的具体方法。最后,利用武广客运专线预载路堤的实测数据验证了设计的有效性和可靠性。预测结果与沉降变形趋势相吻合,施工后沉降完全符合控制标准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号