Corrosion Propagation of Carbon Steel Rebar With Different Concrete Covers and Concrete/Mortar Compositions

机译:不同混凝土表皮和混凝土/砂浆成分的碳素钢钢筋的腐蚀传播

获取原文

摘要

The corrosion propagation of steel embedded in concrete is still not well understood. It is known that corrosion products build up and eventually cause cracks (when the metal loss reaches a critical penetration x_(crit)) by exceeding the tensile stress that concrete can support due to the larger volume that the corrosion products occupy. Moreover, it has been reported that the amount of corrosion products that could cause concrete to crack is dependent on the length of the anode (corroding site), rebar diameter, and the concrete cover thickness. In this project, three types of specimens were investigated. Specimen type 1 contained a #3 rebar with 0.8 or 1.2 cm cover and the rebar was embedded in mortar; a w/cm of 0.38 was used for most specimens and a few specimens were prepared with w/cm of 0.45. Specimen type 2 contained #5 rebar, a single rebar with a concrete cover of 5 cm, and two different concrete compositions with a w/cm of 0.41 (OPC and OPC+ 20% Fly Ash). These specimens have been within the corrosion propagation period for over three years. The third type of specimens are instrumented segments of reinforced concrete pipes, initially with no chlorides, but chlorides were transported via migration to initiate corrosion after a short period of time. The reinforced concrete pipes contained steel strands that range from 4.5 to 5.5 mm in diameter. The propagation period reported in here on all of the different type of specimens was at least 600 days. In just a few cases corrosion products were observed at the concrete/mortar surface and only some of the mortar specimens and one of the type 3 specimens showed cracks after corrosion was propagating for at least a year. Linear polarization, corrosion potential and electrochemical impedance spectroscopy tests were used to periodically monitor some of the specimens. Selected specimens were terminated and forensic examination was performed.
机译:埋入混凝土中的钢的腐蚀传播仍未得到很好的理解。众所周知,由于腐蚀产物占据了更大的体积,腐蚀产物积聚并最终超过了混凝土所能承受的拉应力,最终导致裂纹(当金属损失达到临界渗透率x_(crit)时)。此外,据报道,可能导致混凝土破裂的腐蚀产物的量取决于阳极的长度(腐蚀部位),钢筋直径和混凝土覆盖层的厚度。在这个项目中,研究了三种类型的标本。类型1的样本包含#3钢筋,覆盖层为0.8或1.2厘米,并且钢筋埋在砂浆中。大多数样品使用的w / cm为0.38,制备的一些样品的w / cm为0.45。类型2的样本包含#5钢筋,一根5 cm混凝土保护层的钢筋以及w / cm为0.41的两种不同的混凝土成分(OPC和OPC + 20%粉煤灰)。这些标本已进入腐蚀传播期三年以上。第三类标本是钢筋混凝土管道的仪器部分,最初没有氯化物,但氯化物是通过迁移而运输的,在短时间后开始腐蚀。钢筋混凝土管中的钢绞线直径为4.5到5.5毫米。在此报告的所有不同类型标本的繁殖期至少为600天。仅在少数情况下,在混凝土/砂浆表面上观察到腐蚀产物,只有一些砂浆试样和一种3型试样在腐蚀传播了至少一年后才出现裂纹。线性极化,腐蚀电位和电化学阻抗谱测试用于定期监测一些样品。终止选定的标本并进行法医检查。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号