首页> 外文会议>IEEE International Conference on Smart Energy Grid Engineering >Design optimization model for the United Arab Emirates power sector under uncertainty
【24h】

Design optimization model for the United Arab Emirates power sector under uncertainty

机译:不确定条件下阿拉伯联合酋长国电力部门的设计优化模型

获取原文

摘要

A mixed integer linear programming model for the optimal design of the United Arab Emirates power infrastructure under uncertainty is presented. The optimization objective is the minimization of the power generation costs in the UAE under techno-economic and environmental constraints. Uncertainty is considered in the carbon tax price and social benefits associated with the avoidance of air emissions. The optimization problem was formulated in the General Algebraic Modeling System (GAMS®). The novelty of the present work consists of determining the most suitable combination of power generation plants under uncertainty. This work also considers the introduction of alternative energy sources such as nuclear and renewables into the country's power fleet. Two case studies are solved to demonstrate the usefulness of the devised approach.
机译:提出了不确定条件下阿拉伯联合酋长国电力基础设施优化设计的混合整数线性规划模型。优化目标是在技术经济和环境约束下,最大限度地降低阿联酋的发电成本。碳税价格和与避免空气排放有关的社会利益中考虑了不确定性。优化问题是在通用代数建模系统(GAMS®)中提出的。当前工作的新颖性在于确定不确定性下最合适的发电厂组合。这项工作还考虑将替代能源如核能和可再生能源引入该国的电力机队。解决了两个案例研究,以证明该方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号