首页> 外文会议>Pipelines conference >Siphons Galore: Crossing under a Lake, a Hill, and a Highway by Designing Inverted Siphons for King County's Mercer Enatai Project
【24h】

Siphons Galore: Crossing under a Lake, a Hill, and a Highway by Designing Inverted Siphons for King County's Mercer Enatai Project

机译:Siphons Galore:通过设计倒立县城Mercat Entai项目的倒立山脉下的湖泊,山丘和高速公路。

获取原文

摘要

King County's Mercer and Enatai Interceptors were built in the 1960s and extend over 14,000 feet from Mercer Island into the Enatai neighborhood of Bellevue, Washington. The Interceptors primarily receive flows North Mercer Pump Station but also collect flows from the local city of Mercer Island and city of Bellevue sewer systems. Some parts of the system are reaching the end of their useful lives, and future peak flows are projected to exceed the system's capacity shortly. After the county chartered the need to upgrade the existing interceptors, an in-depth alternative analysis and preliminary design process resulted in a new system design including three inverted siphon segments. This paper reviews the unique set of constraints and hydraulic design challenges presented by each of the siphons and discuss the different strategies and tools that were used to develop and evaluate the proposed solutions. Some of the key items that will be covered include: concept development, system design approach, sedimentation strategy, control structure design, steady state hydraulic modeling, air management review, and computational fluid dynamic modeling.
机译:国王县的Mercer和Enatai拦截器建于20世纪60年代,距离Mercer Island超过14,000英尺,进入华盛顿贝尔维尤的Enatai社区。拦截器主要接收流动北·梅克泵站,而且还收集来自当地城市的Mercer Island和Bellevue下水道系统的流量。系统的某些部分正在达到其有用的生命结束,未来的峰值流量将不久预计超过系统的容量。在县租赁需要升级现有拦截器后,深入的替代分析和初步设计过程导致了一种新的系统设计,包括三个倒虹吸段。本文审查了每个SIPHONS提供的独特限制和液压设计挑战,并讨论了用于开发和评估所提出的解决方案的不同策略和工具。将涵盖的一些关键项目包括:概念开发,系统设计方法,沉降策略,控制结构设计,稳态液压建模,航空管理审查和计算流体动态建模。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号