Initially in 2004, the City of Garland, Texas, approached Freese and Nichols, Inc. (FNI), about decommissioning a small lift station that was becoming a maintenance problem for the City staff. The City did not want to expend effort or funds into rehabilitating or replacing the lift station; it has preferred to eliminate lift stations, if possible, throughout the City. FNI conducted a study of the lift station service area, the gravity collection system in proximity of the lift station, and the topography of the immediate area surrounding the lift station site. The results of the study determined that it would require trench cuts in excess of 50-feet to install a gravity line by open-cut methods to the downstream system, and at the time the trenchless technology was not advanced enough to install a gravity wastewater line at grade for the lengths required for connecting to the existing collection system. FNI recommended to rehabilitate or replace the lift station due to the excessive expense and risk involved in attempting to run a new gravity line to eliminate the lift station. The City opted to wait, and attempted to maintain the existing lift station. Fast forward to 2014. The City of Garland contacted FNI to reinvestigate the same lift station and collection system. After 10 more years of use and maintenance, the lift station was even more of a problem for the City maintenance staff. FNI reviewed the 2004 study and determined that improvements in trenchless technology capabilities made it feasible to install a new gravity line at grade. The new line would enable the City to eliminate the lift station and connect the existing collection system to the service area of the existing lift station. This project would require over 3,500 feet of pipe to be installed by trenchless methods on a grade of approximately 0.01 ft./ft. grade. The project was successfully installed and was put in service in the Spring of 2016 as designed. Now that trenchless technologies are making it more feasible to eliminate lift stations, this paper will give utility owners a greater understanding of what trenchless installation entails and what to consider when making that decision. The paper will show the audience how the City of Garland team researched, designed and constructed the project. It will describe the installation options that the project team explored, the precautions they took during design, and the measures they implemented to minimize risks. The paper will also discuss construction issues and challenges that trenchless projects may encounter, as well as lessons learned and other guidance for utility owners.
机译:最初在2004年,德克萨斯州甘陵市接近弗利和尼科尔斯,Inc。(FNI),关于退役的小电梯站,这是城市工作人员的维护问题。这座城市不想将努力支出或资金进入康复或更换电梯站;如果可能,在整个城市可能首选消除提升站。 FNI对电梯站服务区进行了研究,推力站附近的重力收集系统,以及升降站点周围的立即区域的地形。该研究的结果确定它需要超过50英尺的沟槽切割,以便通过开割方法在下游系统中安装重力线,并且在挖沟技术没有足够前进以安装重力废水线在级别连接到现有收集系统所需的长度。由于在试图运行新的重力线来消除升降机时,FNI建议恢复或更换升降机。这座城市选择等待,并试图维护现有的提升站。快进至2014年。花环市联络了FNI以加注相同的电梯站和收集系统。经过10年的使用和维护后,电梯站甚至更多的城市维护人员的问题。 FNI审查了2004年的研究,并确定了在级别安装新的重力线,这使得巨型技术能力的改进是可行的。新线将使城市能够消除电梯站,并将现有的收集系统连接到现有电梯站的服务区域。该项目需要超过3,500英尺的管道,通过轨道的方法安装在大约0.01英尺/尺的等级上。年级。该项目已成功安装,并于2016年春季投入服务,如设计。现在,挖掘技术可以更加可行的是消除升电站,本文将为实用业主提供更大的了解,在制定决策时需要考虑什么。本文将展示观众嘉兰队城市如何研究,设计和构建该项目。它将描述项目团队所探讨的安装选项,他们在设计期间采取的预防措施以及他们实施的措施,以最大限度地减少风险。本文还将讨论施工问题和挑战,即不必要的项目可能遇到,以及顾客的经验教训以及实用业主的其他指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号