Combined Interceptor Rehabilitation—Large-Diameter Sewer Presents Large Obstacles and Great Opportunity for North Charleston Sewer District

机译:联合拦截器康复 - 大直径下水道为北查尔斯顿下水道区提供了巨大的障碍和巨大的机会

获取原文

摘要

The success of the project, despite the difficult aspects of the site and the work completed can be attributed to the spirit of teamwork demonstrably applied during every stage of the project. The teamwork began with the relationship between the NCSD (Owner) and WK Dickson (Engineering Consultant), who have undertaken numerous challenging projects involving their collection system over the past several years. These projects require early planning, an intimate familiarity with the route of the host pipe and alternative for the bypass in the design and construction. Adjustments and field revisions on the fly are the norm, rather than the exception. The CIPP rehabilitation of other large diameter sections of the Cooper Interceptor served as training for the Combined Interceptor. The railway and roadway crossings were large obstacles, but not unique nor new to the design team. The initial planning by engineers from the NCSD and WK Dickson along with the feasibility analysis by Jacobs Engineering Group's (Sub Consultant) sewer rehabilitation specialist, Stephen Lindsey, gave the confidence that the project would be successful. Mr. Lindsey also performed resident project representation services, interacting, coordinating and observing operations by the Contractor throughout the rehabilitation construction phase. The affected property owners and regulatory agencies bought in and assisted as they could to facilitate finalization of the plans, permits, and regulatory agreements to allow the project to get underway. Lastly, the contractor joined the project with a cooperative, team-oriented approach and proceeded to construct the project in an efficient and professional manner. SAK demonstrated their desire to accept the challenges and execute the project. The contractor with their subcontractors and the other participants and stakeholders pulled together with cooperative efforts to complete this rather large and complex project.
机译:该项目的成功,尽管该网站的困难方面以及完成的工作可以归因于项目的每个阶段在项目的各个阶段都能归功于团队合作的精神。该团队合作开始于NCSD(所有者)和WK Dickson(工程顾问)之间的关系,他们在过去几年中承担了涉及其收藏系统的许多具有挑战性的项目。这些项目需要早期规划,对主管路径的静电熟悉,以及旁路在设计和施工中的替代方案。一般调整和现场修订是常态,而不是例外。 Cooper拦截器的其他大直径部分的CIPP恢复为组合拦截器的培训。铁路和巷道的过境点是大障碍,但设计团队的独特也不是新的。由NCSD和WK Dickson的工程师的初始规划以及Jacobs Engineering Group的(Sub顾问)下水道康复专家的可行性分析斯蒂芬林赛,给出了该项目会成功的信心。 Lindsey先生还通过整个康复建设阶段进行了承包商的居民项目代表服务,互动,协调和观察业务。受影响的财产所有者和监管机构购买并协助,以促进最终确定计划,许可和监管协议,以允许该项目正在进行中。最后,承包商以合作的团队为导向的方法加入了项目,并以高效和专业的方式进行了建设项目。 SAK展示了他们渴望接受挑战并执行该项目。承包商与他们的分包商和其他参与者和利益相关者一起汇集了合作努力,以完成这个相当大的复杂的项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号