JEA Scores Twice-2 Major HDDs Launched From Jaguars Stadium Parking Lot

机译:JEA从Jaguars体育场停车场发射了两次的22个主要的HDD

获取原文

摘要

This paper will discuss a challenging 4,200 foot Horizontal Directional Drill (HDD) crossing of the St. Johns River in Jacksonville, Florida, with a 42-inch steel casing pipe and 36-inch high density polyethylene pipe (HDPE) carrier pipe. The project provides a new force main for one of JEA's largest wastewater pump stations, increases system reliability and provides operational flexibility for JEA. The existing pump station force main crossing the St. Johns River is a 42-inch ductile iron pipe installed over 40 years ago. Connections to the existing pump station were configured to avoid any pump station shutdown or bypass. The entry point for the HDD crossing started in the heavily used parking lot of EverBank Field - home of the Jacksonville Jaguars. The HDD alignment traverses a number of surface and sub-surface features including a large box culvert, abandoned gantry rails and piles, a stormwater pond, piles supporting an elevated expressway, a deep bulkhead, and finally crosses under the St Johns River. The project also includes a second HDD consisting of 840 feet of 36-inch HDPE pipe installed under a large drainage culvert, other utilities and abandoned infrastructure in the stadium parking lots. The pipe for both HDDs was delivered, assembled, and staged within the stadium parking lots. While there were significant challenges during pre-design and design to find the best route through the obstacles, the hard work paid off during construction with clearly identified existing features, settlement monitoring of key structures and construction being completed in time for kickoff of the 2016 Jacksonville Jaguars NFL football season. The success of this high profile project required close and constant collaboration between the contractor, designer, driller, client, and stakeholders.
机译:本文将讨论佛罗里达州杰克逊维尔圣约翰河的挑战4,200英尺水平方向钻(HDD)交叉,带有42英寸的钢套管和36英寸高密度聚乙烯管(HDPE)载体管。该项目为JEA最大的废水泵站之一提供了一项新的力量,提高了系统可靠性,并为JEA提供了可操作的灵活性。现有的泵站力主要穿过圣约翰河是40英寸的延展性铁管,超过40年前安装。与现有泵站的连接被配置为避免任何泵站关闭或旁路。 HDD Crossing的入学点开始于杰克逊维尔捷豹的大量使用停车场。 HDD对齐遍历一些表面和底表面特征,包括大盒子涵洞,废弃的龙门轨道和桩,雨水池塘,支撑高速公路的桩,深层舱壁,最后在圣约翰河下交叉。该项目还包括第二个硬盘,包括840英寸的36英寸HDPE管道,安装在大型排水罩,其他公用事业和体育场停车场中的废弃基础设施。在体育场停车场内交付,组装和上演两个硬盘的管道。虽然在预设计和设计期间有重大挑战,但要通过障碍物找到最佳路线,但在施工期间支付的艰苦工作,明确确定了2016年杰克逊维尔的开球时关键结构和施工的定居监测和建设。捷豹NFL足球季节。这项高调项目的成功需要承包商,设计师,钻机,客户和利益相关者之间的密切和不断的合作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号