Improved Design and Constructability through Five Installation Methods for One HDPE Pipeline Project

机译:通过五个HDPE管道项目的五种安装方法改进了设计和构造性

获取原文

摘要

Most utilities are faced with replacing aging infrastructure while experiencing an ever reducing repair and replacement budget. Determining cost effective ways to repair and replace infrastructure in a cost effective manner led the South Seminole & North Orange County Wastewater Transmission Authority (SSNOCWTA) to explore multiple pipe installation methods on one project in order to reduce construction costs and disruptions to customers and businesses. SSNOCWTA replaced 8,200-feet (2,500-meters) of existing class 200 PVC pipe due to age and the high probability of failure. Pipe bursting was the first method reviewed to replace the existing force main. During right-of-way permitting coordination it was determined pipe bursting was not permitted in certain locations by the agency controlling the right-of-way. Therefore, supplementary pipe installation methods were required. Following the design process, a total of five (5) HDPE pipe installation methods were chosen. This paper will discuss the applicability and benefits of the five (5) HDPE pipe/fitting installation methods. By utilizing different installation methods, engineers can provide value to their utilities by producing a more constructible project that minimizes disruptions to customers, businesses and the environment. The additive value of all the advantages incorporated into the project saved SSNOCWTA over $215,000 and two months of construction time.
机译:大多数公用事业都面临着替换老化基础设施,同时经历了减少维修和更换预算。以成本效益的方式确定维修和替换基础设施的成本有效的方法,LED南部半泳巷和北橙县污水传输局(SSNOCWTA)在一个项目上探索多个管道安装方法,以减少对客户和企业的建设成本和中断。由于年龄和失败概率高,Ssnocwta取代了8,200英尺(2,500米)的现有类200 PVC管道。管道爆发是第一种审查的方法,以替换现有的力量。在通行权允许协调期间,该机构控制权的某些位置不允许确定管道爆发。因此,需要补充管道安装方法。在设计过程之后,共选择共五(5)个HDPE管道安装方法。本文将讨论五(5)个HDPE管/配件安装方法的适用性和益处。通过利用不同的安装方法,工程师可以通过生产更明显的项目来为其实用程序提供价值,这会最大限度地减少对客户,企业和环境的中断。该项目中的所有优势的添加剂值可节省超过215,000美元和两个月的施工时间的Ssnocwta。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号