首页> 外文会议>Pipelines conference >Lessons Learned from Horizontal Directional Drilling Installation of HDPE Sewer Forcemains in Anne Arundel County, Maryland
【24h】

Lessons Learned from Horizontal Directional Drilling Installation of HDPE Sewer Forcemains in Anne Arundel County, Maryland

机译:从马里兰州安妮·阿伦德尔县的HDPE下水道管道水平定向钻井安装中学到的教训

获取原文

摘要

Anne Arundel County is currently in the process of replacing approximately 25,000 linear feet (LF) of sewer forcemains (FM) using horizpntal directional drilling (HDD) for trenchless installation. The County has initiated a small diameter sewer FM replacement project to rehabilitate and/or replace small diameter sewer FMs that have reached the end of their useful life and/or have a history of breaks/failures. The County decided to use HDD to protect existing infrastructure and minimizing environmental disturbance and to streamline regulatory reviews and approvals. This paper focuses on six individual contracts in Anne Arundel County, Maryland that have utilized HDD. The challenges encountered on each of the contracts are highlighted and then summarized as lessons learned for general HDD installation. The conclusions from the lessons learned are summarized below: 1. The more information that is gathered in the design phase the smoother the construction phase will be. 2. The clearer the contract documents are the less room for change orders during construction. 3. A good public outreach program is essential.
机译:Anne Arundel County目前正在使用WhinePntal定向钻孔(HDD)代替大约25,000个线性脚(LF)的下水道,用于挖掘装置。该县已启动小直径的下水道FM更换项目,以恢复和/或更换已达到其使用寿命结束的小直径下水道FMS和/或有休息/失败的历史。该县决定使用HDD来保护现有的基础设施,最大限度地减少环境干扰,并简化监管评价和批准。本文重点介绍了已利用HDD的阿恩·阿伦德尔县六个个人合同。每个合同遇到的挑战都突出显示,然后汇总为为一般HDD安装汲取的经验教训。学习的经验教训的结论总结如下:1。在设计阶段聚集的信息越多,建设阶段的更顺畅将是。 2.合同文件更清晰的是建设期间更改订单的空间。 3.良好的公共外展计划至关重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号