【24h】

Highland City Repurposing of an Existing Substation Property for Upgrade to New Substation Facilities

机译:高地市将现有的变电站资产改造为新的变电站设施

获取原文

摘要

This abstract outlines the process and challenges of designing and constructing a new 230kV-U5kV Transmission Substation (TS) and a new 115kV-12kV Distribution Substation (DS) adjacent to an existing operating 115kV-12kV TS/DS. Once the new TS and DS were constructed, the old substation was disassembled and demolished to make room for a Static Var Compensator (SVC) substation on the old substation property. The design and construction of this project presented many challenges such as limited property for expansion, existing utilities onsite, Florida Department of Environmental Protection (FDEP) and Army Corp of Engineers (ACOE) jurisdictional wetlands onsite requiring dredge and fill permitting, FDEP and Bay County Florida stormwater permitting requirements, high groundwater levels, and poor soils onsite with PEAT layers at approximately 10' - 20' of depth requiring deep foundations to support substation equipment. The use of direct embedded concrete poles for dead end structures as well as for bus support and switch structures was used for both the TS and DS. What made this project successful was the close coordination between Gulf power, civil design, transmission line design, and physical substation design to provide innovative solutions to accommodate project size on limited property with many site challenges including a short project timeframe.
机译:该摘要概述了设计和建造新的230kV-U5kV输电变电站(TS)和新的115kV-12kV配电变电站(DS)并与现有的115kV-12kV TS / DS相邻的过程和面临的挑战。建造完新的TS和DS后,将旧变电站拆解并拆除,以便为旧变电站物业上的静态无功补偿器(SVC)变电站腾出空间。该项目的设计和施工提出了许多挑战,例如扩建的财产有限,现有的公用设施,佛罗里达州环境保护局(FDEP)和需要挖泥和填土许可的美国陆军工程兵团(ACOE)管辖湿地,FDEP和贝县佛罗里达州的雨水许可要求,高地下水位和现场较差的土壤(PEAT层的深度大约为10'-20'),需要深厚的基础来支撑变电站设备。 TS和DS均使用直接埋入式混凝土杆作为死胡同结构以及母线支撑和开关结构。该项目成功的原因是海湾电力,民用设计,输电线路设计和物理变电站设计之间的紧密协调,以提供创新的解决方案来适应有限属性下的项目规模,并面临许多现场挑战,包括较短的项目时限。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号