Component Test Facility (ComTest) Phase 1 Engineering for 760C (HOOF) Advanced Ultra-Supercritical (A-USC) Steam Generator Development

机译:760C(HOOF)高级超超临界(A-USC)蒸汽发生器开发的组件测试设施(ComTest)第一阶段工程

获取原文

摘要

Babcock & Wilcox Power Generation Group, Inc. (B&W) has received a competitively bid award from the United States (U.S.) Department of Energy to perform the preliminary front-end engineering design of an advanced ultra-supercritical (A-USC) steam superheater for a future A-USC component test program (ComTest) achieving 760C (1400F) steam temperature. The current award will provide the engineering data necessary for proceeding to detail engineering, manufacturing, construction and operation of a ComTest. The steam generator superheater would subsequently supply the steam to an A-USC intermediate pressure steam turbine. For this study the ComTest facility site is being considered at the Youngstown Thermal heating plant facility in Youngstown, Ohio. The ComTest program is important because it would place functioning A-USC components in operation and in coordinated boiler and turbine service. It is also important to introduce the power plant operation and maintenance personnel to the level of skills required and provide initial hands-on training experience. Preliminary fabrication, construction and commissioning plans are to be developed in the study. A follow-on project would eventually provide a means to exercise the complete supply chain events required to practice and refine the process for A-USC power plant design, supply, manufacture, construction, commissioning, operation and maintenance. Representative participants would then be able to transfer knowledge and recommendations to the industry. ComTest is conceived as firing natural gas in a separate standalone facility that will not jeopardize the host facility or suffer from conflicting requirements in the host plant's mission that could sacrifice the nickel alloy components and not achieve the testing goals. ComTest will utilize smaller quantities of the expensive materials and reduce the risk in the first operational practice for A-USC technology in the U.S. Components at suitable scale in ComTest provide more assurance before applying them to a full size A-USC demonstration plant. The description of the pre-front-end engineering design study and current results will be presented.
机译:Babcock&Wilcox发电集团有限公司(B&W)已获得美国能源部的竞争性投标大奖,以进行先进的超超临界(A-USC)蒸汽过热器的初步前端工程设计。用于未来的A-USC组件测试程序(ComTest),可达到760C(1400F)的蒸汽温度。当前的奖项将提供继续详细介绍ComTest的工程,制造,构造和操作所需的工程数据。蒸汽发生器过热器随后将蒸汽供应到A-USC中压蒸汽轮机。在本研究中,正在考虑在俄亥俄州Youngstown的Youngstown热力发电厂中使用ComTest设施。 ComTest程序很重要,因为它将正常运行的A-USC组件投入运行,并在锅炉和涡轮机的协调服务中投入使用。向电厂的操作和维护人员介绍所需的技能水平并提供初步的动手培训经验也很重要。研究中将制定初步的制造,建造和调试计划。后续项目最终将提供一种手段,以练习和实践和完善A-USC电厂设计,供应,制造,建造,调试,运行和维护过程所需的完整供应链事件。这样,代表参加者就可以将知识和建议传递给该行业。 ComTest被认为是在独立的独立设施中燃烧天然气,不会危害主机设施,也不会在主机厂任务中遇到相互矛盾的要求,这些要求可能会牺牲镍合金部件而无法达到测试目标。 ComTest将利用少量昂贵的材料,并在美国首次采用A-USC技术的操作实践中降低风险.ComTest中合适规模的组件在将其应用于大型A-USC示范工厂之前提供了更大的保证。将介绍前端工程设计研究和当前结果的描述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号