首页> 外文会议>IFIP WG 5.7 international conference on advances in production management systems >From First Planner to Last Planner: Applying a Capability Model to Measure the Maturity of the Planning Process in ETO
【24h】

From First Planner to Last Planner: Applying a Capability Model to Measure the Maturity of the Planning Process in ETO

机译:从第一个计划者到最后一个计划者:应用能力模型来衡量ETO中计划过程的成熟度

获取原文

摘要

Engineered-to-order (ETO) networks are dynamic and hard to define, and their planning and control functionalities are commonly affected by the actions of suppliers and customers. Frequently, projects experience delays, budget overruns, and quality defects. Consequently, there is a need for project management that synchronizes engineering and production processes throughout the network. The aim of this study is to develop a project planning maturity model (MMPP) in order to improve project performance in ETO manufacturing networks. Moreover, a multiple case study approach is used to test the applicability of the developed maturity model. The results of the case studies from three ETO case companies show that there is (1) no or low degree of standardization of the planning processes, and (2) there is little or no integration between engineering and production planning processes.
机译:按订单设计(ETO)网络是动态的且难以定义,其计划和控制功能通常受供应商和客户的行为影响。通常,项目会出现延迟,预算超支和质量缺陷。因此,需要在整个网络中同步工程和生产过程的项目管理。这项研究的目的是开发一个项目计划成熟度模型(MMPP),以提高ETO制造网络中的项目绩效。此外,使用了多案例研究方法来测试开发的成熟度模型的适用性。来自三个ETO案例公司的案例研究结果表明,(1)计划流程没有标准化程度或标准化程度很低,(2)工程和生产计划流程之间几乎没有整合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号