首页> 外文会议>International topical meeting on probabilistic safety assessment and analysis >ANTICIPATED ANALYSIS OF FLAMANVILLE 3 EPR OPERATING LICENSE STATUS AND INSIGHTS FROM LEVEL 1 PSA REVIEW
【24h】

ANTICIPATED ANALYSIS OF FLAMANVILLE 3 EPR OPERATING LICENSE STATUS AND INSIGHTS FROM LEVEL 1 PSA REVIEW

机译:1级PSA审查对Flamanville 3 EPR运营许可状态和见解的预期分析

获取原文

摘要

The first generation Ⅲ reactor in France (EPR) is under the final phase of construction at Flamanville (EPR-FA3).For the EPR reactor, the probabilistic studies were developed beginning with the early design and then evolved during the different design phases. These studies were intensively used by both EDF and IRSN, as a complement of other more traditional deterministic methods, leading to many design and studies improvements. It is expected that the plant operator (EDF) will send soon to the Safety Authority the request for operating license of this new reactor. Taking into account the difficulties to assess a new evolutionary design in a rather short term, most of the safety related subjects were already analyzed by IRSN, in the frame of so called "anticipated examination" of the operating license request. In this context, the updated versions of the Level 1 probabilistic studies for internal events and hazards were analyzed by IRSN.
机译:法国第一代Ⅲ反应堆(EPR)处于Flamanville建设的最后阶段(EPR-FA3)。对于EPR反应堆,概率研究是从早期设计开始发展的,然后在不同的设计阶段发展。这些研究被EDF和IRSN广泛使用,作为其他更传统的确定性方法的补充,从而导致了许多设计和研究的改进。预计工厂运营商(EDF)会尽快向安全局发送该新反应堆的运行许可证要求。考虑到在相当短的时间内评估新的进化设计的困难,IRSN已经在所谓的“操作许可请求的“预期检查”框架内,对大多数与安全相关的主题进行了分析。在这种情况下,IRSN分析了内部事件和危害的1级概率研究的更新版本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号