首页> 外文会议>International Conference on Science in Information Technology >Negotiation strategies for meeting scheduling conflict management
【24h】

Negotiation strategies for meeting scheduling conflict management

机译:会议调度冲突管理的协商策略

获取原文

摘要

This study is concerned with personnel availability in meeting as a factor that can influence a meeting's value. Since a meeting schedule is not guaranteed to be fixed until the due date, this study proposes an approach to handling meeting scheduling conflict automatically ahead of the meeting. It specifically aims to maintain a meeting schedule through meeting negotiation strategies in such a way that the failure to fulfill the meeting quorum can be decreased; in other words, rescheduling phase can be avoided. A meeting schedule in this study is a timeslot selected by calculating the social welfare of personnel availability using the Clarke Tax Mechanism. There are two cases which are presented here as the basis for the negotiation process: the negotiation strategy for personnel with zero tax and the negotiation strategy for personnel who are taxed by some costs. The strategies which include personnel replacement and quorum threshold relaxation are embedded into personnel tax criteria. By using these meeting scheduling negotiation strategies, personnel availability can be maintained in order to satisfy the meeting constraint of personnel minimum attendance.
机译:这项研究与会议中的人员可用性有关,因为这可能会影响会议的价值。由于不能保证在预定日期之前确定会议时间表,因此本研究提出了一种在会议之前自动处理会议时间表冲突的方法。它的主要目的是通过会议协商策略来维持会议时间表,从而可以减少未达到会议法定人数的情况;换句话说,可以避免重新安排阶段。本研究中的会议时间表是通过使用Clarke税收机制计算人员可利用性的社会福利而选择的一个时隙。这里提供两种情况作为协商过程的基础:零税人员的协商策略和应税费用人员的协商策略。包括人员替换和法定阈值放宽在内的策略已嵌入到人员税标准中。通过使用这些会议安排协商策略,可以维持人员可用性,以满足人员最少出席的会议约束。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号