首页> 外文会议>IEEE Underwater Technology >Development of cabled OBS for vertical array seismic observation at the C0002G borehole observatory in the Nankai Trough, Japan
【24h】

Development of cabled OBS for vertical array seismic observation at the C0002G borehole observatory in the Nankai Trough, Japan

机译:在日本南海海槽C0002G钻孔天文台开发用于垂直阵列地震观测的电缆OBS

获取原文

摘要

We developed a new cabled OBS (Ocean Bottom Seismometer). The OBS was designed to achieve time synchronized seismic vertical array acquisition with borehole seismometers by being deployed on the seafloor and connected to borehole observatory network system. The OBS comprises 3-component geophone unit, telemetry unit and battery unit installed in each pressure housing. We used 4.5 Hz type geophone elements as a 3-component geophone unit. The geophone unit is connected to the telemetry unit, including A/D converter and telemetry circuits, by using a long electrical cable with length of 50m. The geophone unit housing has a pointed spike at the bottom to penetrate seafloor with depth of around 50 cm by ROV manipulator operation. On Mar. 24, 2014, the OBS system was deployed on seafloor in the vicinity of the C0002G borehole observatory in Nankai Trough, Japan, and connected borehole I/F unit. Observed data were finally transmitted to DONET seafloor cable network via the borehole I/F unit and real-time observation was achieved.
机译:我们开发了一种新的有线OBS(海洋底部地震仪)。 OBS的设计是通过部署在海底并连接到钻孔观测台网络系统,用钻孔地震仪实现时间同步的地震垂直阵列采集。 OBS包括安装在每个压力外壳中的三分量检波器,遥测单元和电池单元。我们使用4.5 Hz型地震检波器元件作为3分量地震检波器单元。地震检波器单元通过使用长度为50m的长电缆连接到遥测单元,包括A / D转换器和遥测电路。地震检波器的外壳底部有一个尖刺,可通过ROV机械手操作穿透深度约50厘米的海底。 2014年3月24日,OBS系统部署在日本南海海槽C0002G钻孔观测站附近的海底,并连接了钻孔I / F单元。最终,观察到的数据通过钻孔I / F单元传输到DONET海底电缆网络,并实现了实时观察。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号