首页> 外文会议>IEEE Aerospace Conference >Managing Cost, schedule, and technical performance through a sustained change framework
【24h】

Managing Cost, schedule, and technical performance through a sustained change framework

机译:通过持续变更框架管理成本,进度和技术绩效

获取原文

摘要

Operating a world-renowned space flight mission portfolio under tight policy, fiscal scrutiny, and increased competition makes open communication, visible performance data, and streamlined processes challenging. To respond to these challenges and meet cost and schedule commitments, Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive process improvement across Goddard's missions. The result is a framework that sustains continuous, lasting change, which actively educates and consistently applies program planning and control (PP&C) techniques to launch on time and on budget, and achieve mission success. The BCI formed an integrated community of flight projects that openly shares and applies best practices to ensure cost effective, on-time delivery for all missions. The BCI team employed a five-phase change framework to structure, guide, and respond to needed improvements and policy changes. To date, the team utilizes cross-cutting assessments of the space flight mission portfolio to envision opportunities that reinforce strengths and improve weaknesses and threats. Once these opportunities are defined, subject matter experts design, develop, and deploy changes that are scaled up or down for adoption, depending on mission requirements, and drive compliance and improve performance. Over 100 major changes were deployed from 2012-2014 spanning various PP&C disciplines to include: schedule, cost, earned value, risk, and configuration management, as well as project coordination, reporting, performance analysis, and employee education. These changes were the basis to improve cost and schedule management as well as to ensure compliance to federal and commercial policies and regulations. This paper will assess how a sustaining change framework provides a long-term strategy to maintain organization responsiveness and to continuously seek refinements and updates to- tools and resources to meet cost and schedule commitments while maintaining technical excellence. This paper will also recommend how similar adoption in government and industry space agencies and companies will assist to collaborate across boundaries and build strategic relationships to achieve common goals in aerospace.
机译:在严格的政策,严格的财政审查和日益激烈的竞争之下,运营着享誉全球的太空飞行任务组合,这将使开放式沟通,可见的性能数据和简化的流程变得充满挑战。为了应对这些挑战并履行成本和进度承诺,戈达德太空飞行中心的飞行项目局采用了业务变更计划(BCI),注入了一系列旨在协调戈达德任务过程改进流程的活动。最终形成了一个持续不断变化的框架,该框架可以积极地教育并始终如一地应用计划和控制(PP&C)技术,以按时,按预算启动并实现任务成功。 BCI组成了一个综合的飞行项目社区,该社区公开共享和应用最佳实践,以确保为所有任务提供具有成本效益的按时交付。 BCI团队采用了五个阶段的变更框架来组织,指导和响应所需的改进和政策变更。迄今为止,该团队利用对太空飞行任务组合的跨领域评估来预见增强实力,改善弱点和威胁的机会。定义了这些机会后,主题专家将设计,开发和部署可按任务要求按比例放大或缩小以进行采用的更改,并推动合规性并提高性能。从2012年到2014年,已部署了100多项重大更改,涵盖了PP&C的各个学科,包括:进度,成本,挣值,风险和配置管理,以及项目协调,报告,绩效分析和员工培训。这些更改是改善成本和进度管理以及确保遵守联邦和商业政策和法规的基础。本文将评估可持续变更框架如何提供长期战略,以维持组织的响应能力,并不断寻求工具和资源的改进和更新,以在保持技术卓越的同时满足成本和进度承诺。本文还将建议政府和工业航天机构和公司采用类似方法将如何协助跨界协作并建立战略关系以实现航空航天的共同目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号