首页> 外文会议>IEEE International Conference on Signal Processing, Informatics, Communication and Energy Systems >Fulfillment of low voltage ride-through requirement of D-PMSG based wind energy conversion system using generator-rotor inertia
【24h】

Fulfillment of low voltage ride-through requirement of D-PMSG based wind energy conversion system using generator-rotor inertia

机译:利用发电机-转子惯性满足基于D-PMSG的风能转换系统的低压穿越要求

获取原文

摘要

As a result of increase in the installed capacity of wind power systems around the world, providing Low Voltage Ride-Through is one of the prime requirements of Grid Codes. Wind farms are now required to comply with stringent connection requirements which include remaining connected during grid faults, providing reactive power support, achieving system stability and voltage regulation. The paper analyzes and implements LVRT requirements for Permanent Magnet Synchronous Generator based Wind Turbine Generator system using MAT-LAB/SIMULINK. With the help of the proposed control strategy, wind turbine stays connected to the grid during fault condition, and the excess energy is stored in generator-rotor inertia instead of dissipating it through a chopper resistor.
机译:由于全球风力发电系统的装机容量增加,因此提供低电压穿越是电网规范的主要要求之一。现在,风电场必须遵守严格的连接要求,其中包括在电网故障期间保持连接,提供无功功率支持,实现系统稳定性和电压调节。本文使用MAT-LAB / SIMULINK分析并实现了基于永磁同步发电机的风力发电机系统的LVRT要求。在提出的控制策略的帮助下,风力发电机组在故障状态下仍保持与电网的连接,多余的能量以发电机-转子惯性的形式存储,而不是通过斩波电阻器消散。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号