首页> 外文会议>IEEE Power and Energy Society Innovative Smart Grid Technologies Conference >Limited Energy Capability Resource Duration Requirement for Participation in PJM Capacity Market
【24h】

Limited Energy Capability Resource Duration Requirement for Participation in PJM Capacity Market

机译:有限的能量能力资源持续时间参与PJM容量市场的要求

获取原文

摘要

Federal Energy Regulatory Commission (FERC) Order 841 urges RTOs and ISOs to open their markets to eligible electric storage resources (ESR). The goal of this study is to formulate PJM capacity market participation rules in compliance with this order that treat different types of resources equally. The proposed method of equivalent duration looks at peak-serving from an energy perspective and interprets the capacity of a resource as its ability to serve a certain MW amount of the peak. This allows taking into account specific technical characteristics of ESR, which in turn alleviates constraints on their ability to participate in the capacity market.
机译:联邦能源监管委员会(FERC)订单841促使RTOS和ISOS将其市场开放到符合条件的蓄电资源(ESR)。本研究的目标是遵守PJM能力市场参与规则,符合此顺序同样处理不同类型资源的顺序。所提出的等同持续时间方法从能量角度看峰值服务,并将资源的容量解释为其服务于峰值的某个MW量的能力。这允许考虑到ESR的具体技术特征,这反过来减轻了他们参与能力市场的能力的限制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号