A Unique Pavement Rehabilitation Treatment for 6th Avenue SE Calgary - Concrete Overlay

机译:第六大道东南卡尔加里的独特路面修复处理-混凝土覆盖层

获取原文

摘要

Maintenance and rehabilitation strategies are critical components of a pavement management system. Effective rehabilitation improves the pavement performance and prolongs the service life of an existing pavement. Strategies for rehabilitation of flexible pavements in Calgary traditionally included mill and overlay or reconstruction. Less common is partial depth in-place recycling and full depth in-place recycling. While the selection of the optimal rehabilitation strategy can be straightforward when the distress is confined to the upper layers, much more complex and expensive repairs are required when the surface problems are related to structural deficiencies in the base or subgrade. Westbound 6th Avenue SE in Calgary between 3rd Street and Macleod Trail is a four-lane roadway (one-way direction) that experienced moderate severity transverse cracking, extreme rutting and ravelling. Most of the distress was noted in the right most bus lane and at the bus stop. A coring program to determine the pavement layer thickness and a FWD survey to determine the back-calculated modulus of the subgrade (Mr) formed the basis for the selection of a rehabilitation strategy. A bonded concrete overlay was selected as a cost-effective methodology while assuring an extended service life. Detailed materials and construction specifications were developed for the project. The initial construction was carried out in September 2010 and was not successful due to the contractor's inexperience. Investigation of the project indicated that the bond between the concrete overlay and asphalt surface was not achieved, the thickness of overlay varied, the concrete used was not suitable for the application and the control joints were not correctly installed. The re-construction commenced in May 2013 over a long weekend. Within 48 hours, the existing concrete overlay was removed, pre-overlay repairs were conducted, surfaces were cleaned to provide a good bond with concrete, and, the overlay was placed followed by curing compound application and control joints construction. Post-construction inspection indicated no major reflective cracking and a good quality surfacing for the bus lane. This rehabilitation project confirms that bonded concrete overlays provide an alternate solution to flexible pavement rehabilitation particularly for high volume heavy traffic sections with frequent stops and take-offs. The construction experience from this project also emphasized the need for well-defined specifications, experienced contractors and a quality management program during the pre-construction, construction and post-construction activities. This paper discusses all the above activities and the challenges with the construction in detail.
机译:维护和修复策略是路面管理系统的关键组成部分。有效的修复可改善路面性能并延长现有路面的使用寿命。卡尔加里的柔性路面修复策略传统上包括碾磨和覆盖或重建。较不常见的是局部深度就地回收和完全深度就地回收。虽然当遇险仅限于上层时,最佳修复策略的选择很简单,但是当表面问题与基础或路基的结构缺陷有关时,则需要进行更为复杂和昂贵的维修。位于卡尔加里(Calgary)第三街与Macleod Trail之间的第六大道西行(Westbound)是一条四车道巷道(单向),经历了中等程度的横向裂缝,极度车辙和撕裂。大多数困扰都在最右边的公交车道和公交车站出现。确定路面层厚度的取芯程序和确定路基(Mr)的反算模量的FWD测量构成了选择修复策略的基础。选择一种粘结混凝土覆盖层作为一种经济有效的方法,同时确保延长使用寿命。为该项目制定了详细的材料和施工规格。最初的施工于2010年9月进行,由于承包商的经验不足,因此没有成功。该项目的调查表明,未实现混凝土表层与沥青表面之间的粘结,表层厚度变化,所使用的混凝土不适合该应用,并且控制接头未正确安装。重建工作于2013年5月在一个漫长的周末开始。在48小时内,移除了现有的混凝土覆盖层,进行了覆盖层前的修复,清洁了表面以提供与混凝土的良好粘结,然后放置覆盖层,然后进行固化剂施工和控制接缝的施工。施工后的检查表明,公交专用道没有大的反射裂缝,并且表面质量良好。该修复项目证实,粘结混凝土覆盖层可为柔性路面修复提供替代解决方案,特别是对于频繁停靠和起飞的大流量交通路段。该项目的建设经验还强调了在施工前,施工和施工后活动期间需要有明确定义的规格,经验丰富的承包商和质量管理计划。本文详细讨论了上述所有活动以及建设面临的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号