Systems Integration on a Light Rail Project: A Tale of Two Agencies

机译:轻轨项目上的系统集成:两个代理商的故事

获取原文

摘要

Subject Track: Passenger & Transit As Transit Agencies progress to build new Light Rail Transit (LRT) Projects or extend existing Starter lines, one of the newer elements has been Interface Management or Design Integration between the Civil design and the Systems design. In the Seattle area, Sound Transit has incorporated some of the Design Integration processes utilized by the Aerospace Industry in the Puget Sound region as it extends the initial Central Link LRT line east to Bellevue and Redmond, WA. In Hawaii, the Honolulu Authority for Rapid Transit (HART) accomplishes the same integration of the Design/Build Systems contract elements into their Aerial Station Final Design construction contracts through an Interface Management approach. As the benefits of a Systems Integration or Design Interface approach become more widely known in the Rail Transit Industry, the pros and cons of how and when to use these tools in the various design and construction contracts becomes more apparent. Supporting the integration process, Sound Transit has been increasing the use of clash detection on the 3-D models for the stations in each stage of the design process. To document the design decisions or respond to design questions, Sound Transit uses a centralized ICD Database. Similarly, in Honolulu, HART utilizes an Interface Management approach with the progress on each design decision or direction tracked through a contract management system database. In summary, Interface Management/Design or Systems Integration may use different tools or have a different role depending on the type of the rail transit construction contract. Body of paper, including an introduction and conclusion (tables, graphics and figures may be included in the body of the text).
机译:主题跟踪:客运与运输随着运输机构逐步建立新的轻轨运输(LRT)项目或扩展现有的Starter线路,新的要素之一是土木设计与系统设计之间的接口管理或设计集成。在西雅图地区,Sound Transit已将普吉特海湾地区航空航天业利用的一些设计集成流程纳入其中,因为它将最初的Central Link LRT线向东延伸至华盛顿州的贝尔维尤和雷德蒙德。在夏威夷,檀香山快速交通管理局(HART)通过接口管理方法,将设计/建造系统合同要素成功地集成到了他们的空中车站最终设计施工合同中。随着系统集成或设计接口方法的优势在轨道交通行业中越来越广为人知,在各种设计和施工合同中如何以及何时使用这些工具的利弊变得更加明显。为了支持集成过程,Sound Transit在设计过程的每个阶段都在车站的3-D模型上增加了碰撞检测的使用。为了记录设计决策或回答设计问题,Sound Transit使用集中式ICD数据库。同样,在檀香山,HART利用接口管理方法,通过合同管理系统数据库跟踪每个设计决策或方向的进度。总之,根据轨道交通建设合同的类型,接口管理/设计或系统集成可以使用不同的工具或扮演不同的角色。论文正文,包括引言和结论(正文中可能包含表格,图形和图形)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号