Boiler tube failures remain the leading cause of lost availability in power boilers across global markets. The need for strategic planning in regard to inspections, preventative maintenance and targeted replacements has never been greater. Identifying the root problem(s) is essential and must be properly managed for continued safety, reliability and availability. The process associated with integrating a boiler management program can be viewed as an insurmountable obstacle for many utility operators and owners. In many cases, the cookie cutter approach that is often used results in insufficient reliability recovery. However, using modern technology and tactics to strategically manage and properly identify specific operating and design conditions has proven exceedingly successful in reducing a unit's forced outage rate [EFOR]. Specific challenges plants are faced with include the reduction of onsite engineers, aging workforces and equipment, and the need to remain competitive in a challenging global energy market. Plant managers are routinely faced with the complex task of determining the current condition of their equipment, forecasting outage budgets and schedules, and performing risk assessments. Additionally, insurance companies are increasingly requiring inspection and maintenance records that are not always up-to-date or readily available. The solutions to reducing the EFOR of a unit involves taking a comprehensive approach to boiler management utilizing unit specific operational training, advanced data management, and strategic inspection, maintenance and replacement prioritization. Implementing this comprehensive approach has awarded millions in savings for plant managers that have adopted this strategy. Implementing a unit specific, target driven, and strategic plan enables utility owners and operators to succeed in today's competitive market by increasing the unit's reliability and availability without sacrificing safety or environmental standards. Thielsch Engineering, Inc. developed a program titled: 4-SYTE System Strategy that is currently utilized in more than 60 power plants within the United States and Canada. Unit specific strategic planning is necessary for all facilities that rely on these critical components. Advanced technology must be adopted by all energy producers to ensure they remain competitive and profitable.
机译:锅炉管故障仍然是全球市场动力锅炉可用性下降的主要原因。对检查,预防性维护和有针对性的更换等方面的战略规划的需求从未如此迫切。确定根本问题至关重要,必须对其进行适当管理,以确保持续的安全性,可靠性和可用性。对于许多公用事业运营商和业主而言,与集成锅炉管理程序相关的过程可被视为不可逾越的障碍。在许多情况下,经常使用的曲奇切割器方法会导致可靠性恢复不足。但是,事实证明,使用现代技术和策略来战略性地管理和正确识别特定的操作和设计条件,已成功地降低了设备的强制停机率[EFOR]。工厂面临的具体挑战包括减少现场工程师,老化的劳动力和设备,以及在充满挑战的全球能源市场中保持竞争力的需求。工厂经理通常要面对确定设备当前状态,预测停机预算和计划以及进行风险评估的复杂任务。此外,保险公司越来越多地要求检查和维护记录不总是最新的或容易获得的。减少机组EFOR的解决方案包括采用针对机组的特定操作培训,高级数据管理以及战略检查,维护和更换优先级的综合方法来进行锅炉管理。实施这种综合方法已为采用该策略的工厂经理节省了数百万美元的费用。实施特定于单位的,目标驱动的战略计划,使公用事业所有者和运营商能够在不牺牲安全性或环境标准的前提下提高单位的可靠性和可用性,从而在当今竞争激烈的市场中取得成功。 Thielsch Engineering,Inc.开发了一个名为“ 4-SYTE系统策略”的程序,该程序目前在美国和加拿大的60多个发电厂中得到利用。依赖于这些关键组件的所有设施都必须制定单位特定的战略计划。所有能源生产商都必须采用先进的技术,以确保它们保持竞争力和盈利能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号