The Camisea Pipeline Transmission System (PTS) in Peru consists of two parallel pipelines, a Natural Gas (NG) pipeline and a Natural Gas Liquids (NGL) pipeline. The NG pipeline is 834 km long, including a 105 km loop. The NGL pipeline is 557 km long. Since 8 years ago and as a part of the current operation of the system, maintenance activities are being carried which, within its objectives for improvement, seek to establish a preventive approach instead a corrective approach. The involved areas in this new Management approach are geo-technics, pipelines, environment, communities and integrity. This paper describes the process named Integral Plan for Operating Risks. This process is a result of the updating of the geological-geotechnical base-line, in relation to the environmental and social context, allowing a comprehensive analysis of the status of the relation between the works and its environment, as well as planning prevention tasks able to guarantee the stability of the right of way (RoW) and the pipeline Integrity. This job is performed by both desk work (remote interpretation) and field work conducted by multidisciplinary teams, which ensures a transverse communication flow. All of this is backed by a digital database and a geographical information system (GIS). A Technical Atlas is constructed as a graphic document containing a series of cartographic and text cards regarding the sector under study as a useful instrument of preventive management for intervention in a given area. To date, a comprehensive remote analysis of the RoW has been completed and an in-site field analysis has started, upon which strategies are being developed in order to control items such as geological hazards, geological architecture, vegetation architecture, RoW stability, etc. Jobs were competed along the first 12 km as a pilot experience, which is being replicated all along the RoW.
机译:秘鲁的Camisea管道传输系统(PTS)由两条平行管道组成,天然气(NG)管道和天然气液(NGL)管道。天然气管道长834公里,包括105公里的环路。 NGL管道长达557公里。自8年前以来,作为系统当前运行的一部分,进行了维护活动,维护活动在其改进目标范围内寻求建立预防性方法,而不是纠正性方法。这种新的管理方法涉及的领域是岩土技术,管道,环境,社区和完整性。本文介绍了名为“操作风险整体计划”的过程。该过程是根据环境和社会背景更新了地质-岩土技术基准线的结果,可以对工程与其环境之间的关系状况进行全面分析,并可以规划预防任务以确保路权(RoW)和管道完整性的稳定性。这项工作是由案头工作(远程口译)和由多学科团队进行的野外工作来完成的,这确保了横向沟通的畅通。所有这些都得到了数字数据库和地理信息系统(GIS)的支持。技术图集被构造为图形文件,其中包含与所研究行业相关的一系列制图和文本卡,是在给定区域内进行干预的预防性管理的有用工具。迄今为止,已完成对RoW的全面远程分析,并已开始进行现场现场分析,并在此基础上制定策略以控制诸如地质灾害,地质构造,植被构造,RoW稳定性等项目。在最初的12公里内,乔布斯参加了比赛,这是飞行员的经验,并且在整个RoW上都得到了推广。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号