PROTECTION OF PIPELINES UNCOVERED IN CROSSING RIVER - A CASE STUDY

机译:穿越河道管道保护的案例研究。

获取原文

摘要

To ensure the integrity of pipelines in failure mode Geotechnical, TRANSPETRO and the TBG perform underwater inspections of pipelines in the main crossings of rivers, lakes, dams, canals and permanently flooded areas. The inspections are designed to locate guideline and measure the covering the pipelines from the margins and underwater depth, identify any exposure of the pipelines, map the occurrences of blocks of rock or debris on the channel and evaluate the anthropic influence on stability of the sections inspected. Among the crossings rivers inspected, in the Atibaia V, with approximately 27.3 m in length, was observed a high erosive potential, which resulted in the loss cover of 3 (three) pipelines of crossing river, besides the fiber optic cable. The lengths uncovered resulted in approximately 33.0 m, with suspended pipes, damage in the concrete jacket and presence of blocks of rocks in the channel. The pipeline in the most critical situation went vain of 6.0 m, with gap up to 0,2 m in relation the background. The crossing river was studied with bathymetric survey and designed cover the pipelines with mechanical protection and anti-erosive. The pipes were supported with sacks of granular material, sequentially, the margins and pipelines were protected with geotextile filled with concrete, installed with the help of divers. The working conditions of 4.0 m depth, currents of up to 0.8 m/s, temperature and low visibility waters were challenges overcome during execution, in which the divers took turns in short periods. Due to the characteristics of the bedrock, the blankets went stylized and stitched on the field by the team, with dimensions taken on site. After positioning the blankets in the background began the underwater concreting, which occurred in stages monitored by the volume pumped and divers strategically placed. The crossing river was re-inspected approximately 1 (one) year after their stabilization and was found in good conditions. The occurrence improved the procedures for geotechnical monitoring and treatment of pipelines uncovered in crossings rivers, being who the efficiency and safety of the work performed currently serve as a reference for the design of similar works.
机译:为确保故障模式下管道的完整性,Geotechnical,TRANSPETRO和TBG对河流,湖泊,大坝,运河和永久性洪水地区的主要过境管道进行水下检查。检查的目的是定位准则并从边缘和水下深度测量覆盖管道的范围,识别管道的任何裸露,绘制通道上岩石或碎屑块的出现情况以及评估人为因素对检查部分的稳定性的影响。在所检查的过境河流中,Atibaia V长度约为27.3 m,具有很高的侵蚀潜力,除光纤电缆外,还造成了3条(三)过境管道的损失。裸露的长度导致大约33.0 m,其中包括悬吊的管道,混凝土护套的损坏以及通道中岩石块的存在。最紧急情况下的管道徒劳了6.0 m,相对于背景而言,间隙最大为0.2 m。通过测深法对过河进行了研究,并设计了具有机械保护和抗腐蚀作用的管道。管道由粒状材料袋支撑,随后,边缘和管道由填充混凝土的土工布保护,并在潜水员的帮助下进行安装。在执行过程中,潜水员在短时间内轮流工作,克服了4.0 m深度的工作条件,高达0.8 m / s的水流,温度和低能见度的水的挑战。由于基岩的特性,工作队在现场对毯子进行了风格化和缝合,并在现场进行了尺寸标注。在将毯子放置在背景中之后,开始水下浇筑,这是分阶段进行的,由抽水量和有战略意义的潜水员进行监控。渡河稳定后大约一年(一年)进行了重新检查,发现情况良好。该事件改善了穿越河流中发现的管道的岩土工程监测和处理程序,目前谁进行的工作的效率和安全性可以作为类似工程设计的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号