首页> 外文会议>Power Systems Computation Conference >Time series based distribution grid planning approach with decentralised voltage regulation
【24h】

Time series based distribution grid planning approach with decentralised voltage regulation

机译:基于时间序列的具有分散电压调节的配电网规划方法

获取原文
获取外文期刊封面目录资料

摘要

One of the most crucial constraints in operation of power systems is keeping the permitted voltage intervals. Uncontrolled distributed generation may cause voltage problems in distribution grids, due to static power factors. Recent converter technologies allow variation of the power factor. Therefore, the consideration of units with these technologies in the planning process respects their ability of providing reactive power. Then, unnecessary network extension can be avoided. In this paper, an extension of an agent-based simulation platform for distribution networks is presented. The decentralized generation units are represented by agents that are able to adjust the reactive power consumption or in-feed according to the network status. In combination with the voltage control the presented system provides realistic loading and voltage time series for a selected grid section. With this simulation the utilities are able to determine the probability of loading situations and plan their network in a more efficient way.
机译:电力系统运行中最关键的限制之一是保持允许的电压间隔。由于静态功率因数,不受控制的分布式发电可能会导致配电网中的电压问题。最近的转换器技术允许功率因数的变化。因此,在规划过程中考虑使用这些技术的机组要考虑其提供无功功率的能力。然后,可以避免不必要的网络扩展。在本文中,提出了基于代理的配电网络仿真平台的扩展。分散式发电机组由能够根据网络状态调整无功功率消耗或馈电的代理商代表。结合电压控制,本系统为选定的电网部分提供了实际的负载和电压时间序列。通过此仿真,公用事业公司能够确定负载情况的可能性,并以更有效的方式规划其网络。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号