首页> 外文会议>International Conference on Live Maintenance >Application of the stepping pendulum method to long tower arms in 765kV transmission line for live working
【24h】

Application of the stepping pendulum method to long tower arms in 765kV transmission line for live working

机译:步进摆法在765kV输电线路长塔臂上的应用

获取原文

摘要

There are two types of the 765kV transmission line(hereinafter T/L), namely double and single circuit lines. But the single circuit line has no fungible line, so dead line work is very difficult. Moreover it's very hard to set a no-power day for maintenance of the line also. Due to such reasons the 765kV single circuit T/L will be maintained by live line work using bare-handing method and helicopter live working. But in case of the bare-hand method, it's difficult to approach conductors from tower posts because of the complicated tower structures with many step bolts and configuration. Especially tower arm length is very long. So in order to access to the live parts easily on the towers, this paper presents the stepping pendulum method by using two polymer insulator strings or two insulating supports. Moreover this paper proposes application propriety of the stepping pendulum method to long arms in UHV lines.
机译:765kV输电线路(以下简称T / L)有两种类型,即双回路和单回路线路。但是,单条电路线没有可替代的线,因此死线工作非常困难。此外,很难设置无电日来维护线路。由于这些原因,将使用裸手方法和直升机带电作业通过带电作业维护765kV单回路T / L。但是在徒手操作的情况下,由于塔架结构复杂,带有许多阶梯螺栓和配置,因此很难从塔架引出导体。特别是塔臂的长度非常长。因此,为了轻松访问塔上的带电部件,本文提出了使用两个聚合物绝缘子串或两个绝缘支座的步进摆法。此外,本文提出了步进摆法在特高压线路长臂上的适用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号