首页> 外文会议>International Conference on Live Maintenance >Connection and disconnection of large conductive parts during live working at HV and VHV
【24h】

Connection and disconnection of large conductive parts during live working at HV and VHV

机译:高压和超高压带电作业期间大型导电部件的连接和断开

获取原文

摘要

During live working at high and very voltage, it may be necessary to connect or disconnect parts of the network, but also large conducting parts. To carry out these operations, it is necessary to control: - values of current passing to the place where connection or disconnection is made, particularly if you want to carry out operations using the bare hand working method, - the maximum length of the discharge arc to guarantee LW distances, - but also another fundamental parameter, the connection or disconnection speed, particularly if you want to carry out these operations manually without using an appropriate device.
机译:在高压下进行带电工作期间,可能有必要连接或断开网络的各个部分,但也需要连接或断开大型导电部分。要执行这些操作,必须控制:-流到进行连接或断开的地方的电流值,特别是如果您要使用裸手方法进行操作,-放电电弧的最大长度为了保证LW距离-还有另一个基本参数,即连接或断开速度,特别是如果您想在不使用适当设备的情况下手动执行这些操作时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号