There are few industries that can boast having infrastructure with the same longevity as the North American Railroads. Maintaining bridge infrastructure poses its own set of unique challenges that can be attributed to many factors including age, designed carrying capacity, and the geometry of the structure itself. In order to keep trains running at the optimal track speed and protect operations, it is necessary to identify structures for rehabilitation or replacement. Bridge structures that exhibit a history of geometry defects requiring slow orders and ongoing structural concerns are ideal candidates for replacement. The following project description will discuss the overall scope of work, challenges, and construction techniques utilized while replacing the bridge located at N-340.68. This bridge is located just west of the Virginia/West Virginia state line and is a double main two span open deck structure comprised of two 62-foot-long riveted steel plate girder spans with skewed back walls in a 7-1/2 degree curve carrying 3 inches of super elevation originally erected in 1899. The replacement bridge was a double main three span ballast deck structure measuring 221 feet long built along the same alignment supported by two new intermediate piers and two precast abutments that were all supported by 42 inch diameter drilled shafts. Both of the existing bridges remained in service until two separate 80 hour outages removed the existing superstructure and replaced it with the new bridge. At the end 1.4 million pounds of steel had been erected, 735 cubic yards of concrete poured, 514 cubic yards of precast concrete set, 271,000 pounds of rebar tied together, and the total duration was 1 year and 9 months.
机译:几乎没有哪个行业可以拥有与北美铁路一样长寿的基础设施。维护桥梁基础设施会带来一系列独特的挑战,这可归因于许多因素,包括年龄,设计的承载能力以及结构本身的几何形状。为了使火车保持最佳轨道速度运行并保护运行,有必要确定要修复或更换的结构。具有几何缺陷历史且需要缓慢订购并持续存在结构问题的桥梁结构是更换的理想选择。以下项目描述将讨论更换N-340.68桥时使用的总体工作范围,挑战和施工技术。这座桥位于弗吉尼亚州/西弗吉尼亚州州际线的西侧,是双主体两跨开放甲板结构,由两个62英尺长的铆接钢板梁跨度组成,后壁以7-1 / 2度弯曲承载着3英寸的超高仰角,最初建于1899年。替换的桥是一个双主三跨压载甲板结构,长221英尺,沿着相同的路线建造,由两个新的中间墩和两个预制基台支撑,直径均由42英寸支撑钻孔轴。现有的两座桥梁一直保持服务状态,直到两次单独的80小时停机将现有的上层建筑拆除,并用新的桥梁代替了。最终架起了140万磅的钢材,浇筑了735立方码的混凝土,将514立方码的预制混凝土浇筑在一起,将271,000磅的钢筋绑在一起,总工期为1年零9个月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号